Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/09/2024 | ENGR Engineering Final | Partial Pass | TC of O Level 4 for building # (4) added to buildings (5) (6) & (7) | |
| 01/26/2024 | ENGR Engineering Final | Passed | ||
| 01/26/2024 | ENGR Engineering Final | Passed | ||
| 11/29/2023 | ENGR Engineering Final | Not Ready | ||
| 12/15/2023 | ENGR Engineering Final | Partial Pass | TC of O Level (2) for Building #5,#6,#7 only. Total bike racks noted (19) Total Shrubs noted (323) Total Cacti noted (28) Total Trees noted (51) Temp fencing 12’ panels surrounding courtyard play area are noted and at this time are not adequate for a level 4 status. Recall of inspection for Buildings 5,6,7 will be called in the later part of next week. |
|
| 12/21/2023 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 for Building (5) Only. TC Of O Level 2 for Buildings (6) & (7) Remain. |