Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 01/25/2024 |
SITE - Stormwater Setup and Controls |
|
Passed |
|
| 05/31/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Forming up the head walls for the RCP on the south west side of the project. |
| 10/11/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
All set up and controls in place no visible issues at this time. |
| 10/12/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
No issues at this time. |
| 10/13/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
All set up and controls are in place, walked site with Superintendent Don regarding the existing basin at West entry off of Old Nogales Hwy. I will bring the maintenance issue to Dave Roberts attention for further review. |
| 11/02/2023 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
120’ of wattle was replaced along center section of East fence area, no other concerns at this time. |