Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
3096 N DASYLIRION DR
Apply Date:
03/29/2021
Applicant:
Eric Cheney
Description:
Tentative Plat/FLD - Westbridge at Silverbell, a flexible lot development. Lots 1 thru 106, and Comm

Permit Reviews

Permit Number - DP21-0076
Permit Status: Complete
Permit Description: Tentative Plat/FLD - Westbridge at Silverbell, a flexible lot development. Lots 1 thru 106, and Comm
Start Date Submittal Complete Date Status  
03/23/2022 DEV PKG - REVISION 05/12/2022 COMPLETED Review Details
03/29/2021 DEV PKG - OK TO SUBMIT 04/02/2021 COMPLETED Review Details
04/02/2021 TENTATIVE PLAT REVIEW 05/28/2021 COMPLETED Review Details
06/14/2021 TENTATIVE PLAT REVIEW 08/18/2021 COMPLETED Review Details
08/19/2021 TENTATIVE PLAT REVIEW 09/28/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP21-0076
Permit Status: Complete
Permit Description: Tentative Plat/FLD - Westbridge at Silverbell, a flexible lot development. Lots 1 thru 106, and Comm
Total Outstanding Activity Conditions - 2
Date Name
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0076
Permite Description: Tentative Plat/FLD - Westbridge at Silverbell, a flexible lot development. Lots 1 thru 106, and Comm
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
11/09/2021 PDSD Site/Engineering Division - NPPO N/A Partial Pass {Activity date: 11/09/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Native trees to be saved have been flagged}
01/19/2022 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) {Activity date: 01/19/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Conversation with Lorenzo at 245–5064 Dirtworks contract. Requested contractor schedule inspections biweekly. Assisted with schedule requirements.} ; {Activity date: 12/15/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Phone conversation with Chip at 237-7522 with dirt works at about the Matney homes project on Silverbell. Chip will have his foreman schedule the required inspections through the automated system.

}
10/20/2022 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 10/20/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Provide track out protection and concrete containment as required

} ; {Activity date: 07/26/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved. Signage has been reinstalled.} ; {Activity date: 06/16/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Correction required at site entrance and for signage.

} ; {Activity date: 05/25/2022; Status: Denied; Inspector: BBENEDON; Comment: Entered by VVERA1 - denied waddle is not secured,. Please stake as required.} ; {Activity date: 01/27/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Additional controls installed along south property line. SWPPP, NOI obtained and sent to Dave.} ; {Activity date: 11/10/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09152. Continued. Track out rock installed.}
03/26/2024 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Support trees as specified
08/14/2023 ENGR Engineering Final N/A Not Ready
07/18/2024 SITE - Stormwater Follow-up N/A Complete (Recurring) Low control stormwater there’s no damage out here after the rain

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0076
Permit Description: Tentative Plat/FLD - Westbridge at Silverbell, a flexible lot development. Lots 1 thru 106, and Comm
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/18/2024 COT - ENGR - Signage Final Passed
07/18/2024 ENGR Grading Final Passed
03/06/2025 PDSD Site/Engineering Division - Landscaping Passed
03/17/2025 ENGR Engineering Final Passed
03/17/2025 SITE - Stormwater Final Inspection Passed
03/17/2025 SITE - Stormwater Follow-up Passed

Documents

File Name Document Type  
DESIGN PROF AVP REVIEW - DP21-0076 WESTBRIDGE AT SILVERBELL_04-08-2022.PDF DOCUMENTS VIEW
SILVERBELL ARCHITECTURE VARIANCE DOCUMENT.PDF DOCUMENTS VIEW
1-38 OF 38.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER - WESTBRIDGE.PDF DOCUMENTS VIEW
DEQ_FUGITIVE DUST PERMIT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
WAPA LICENSE AGREEMENT, WESTERN AREA POWER ADM, 10.19.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 08.19.21.PDF DOCUMENTS VIEW
WESTBRIDGE DRAINAGE REPORT ADDENDUM DP21-0076.PDF DOCUMENTS VIEW
WESTBRIDGE INFILTRATION TEST RESULTS DP21-0076.PDF DOCUMENTS VIEW
DP21-0076 DRAINAGE REPORT.PDF DOCUMENTS VIEW
DP21-0076 COTDOT LETTER, RIGHT OF WAY.PDF DOCUMENTS VIEW
DP21-0076 SWPPP.PDF DOCUMENTS VIEW
PIMA CO ADDRESSING REVIEW, 04.30.21.PDF DOCUMENTS VIEW
FLD MAILINGS.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL APPLICATION, RECVD 03.26.21 AT 3;45 PM.PDF DOCUMENTS VIEW
GEOTECH REPORT.PDF DOCUMENTS VIEW
PRIVACY MITIGATION PLAN.PDF DOCUMENTS VIEW
SWPPP.PDF DOCUMENTS VIEW
TITLE REPORT.PDF DOCUMENTS VIEW
TRAFFIC IMPACT ANALYSIS.PDF DOCUMENTS VIEW
DP 01-38 WEST BRIDGE AT GORET, 03.29.21.PDF DOCUMENTS VIEW