Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/20/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Provide track out protection and concrete containment as required
|
| 07/26/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Signage has been reinstalled. |
| 06/16/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Correction required at site entrance and for signage.
|
| 05/25/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Denied |
Entered by VVERA1 - denied waddle is not secured,. Please stake as required. |
| 01/27/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Additional controls installed along south property line. SWPPP, NOI obtained and sent to Dave. |
| 11/10/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - 09152. Continued. Track out rock installed. |