Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/28/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to finish the project prep plan before getting engineering final | |
| 03/06/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to clean up the basins over by Dale’s Crossing. I’ll be back more bollards in the area where is needed. Replaced some of the plants that are dead. | |
| 03/17/2025 | ENGR Engineering Final | Passed | ||
| 06/02/2023 | ENGR Engineering Final | Complete (Recurring) | utility work in progress also completion of new residential units. On site with superintendent for Mattamy homes. Request Stormwater follow up inspection. | |
| 06/06/2023 | ENGR Engineering Final | Complete (Recurring) | Asphalt and curbs installed | |
| 07/18/2024 | ENGR Engineering Final | Partial Pass | Contractors job building on lunch. There’s still landscaping to be done per plan. | |
| 08/13/2023 | ENGR Engineering Final | Not Ready | ||
| 11/22/2023 | ENGR Engineering Final | Re-inspection required | install rip wrap per plan, specifications, and slope to avoid ponding. Note, Grading contractor is no longer on site. Landscaping contractor is completing the remainder of the Grading work. Please schedule inspections on a regular basis, as work is being installed. |
|
| 11/30/2023 | ENGR Engineering Final | Re-inspection required | rip wrap in section 3 is not installed for detail on page 8. Please provide revisions for any changes. Ponding is not allowed. |