Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP21-0076
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
06/02/2023 | ENGR Engineering Final | Complete (Recurring) | utility work in progress also completion of new residential units. On site with superintendent for Mattamy homes. Request Stormwater follow up inspection. | |
06/06/2023 | ENGR Engineering Final | Complete (Recurring) | Asphalt and curbs installed | |
07/18/2024 | ENGR Engineering Final | Partial Pass | Contractors job building on lunch. There’s still landscaping to be done per plan. | |
08/13/2023 | ENGR Engineering Final | Not Ready | ||
11/22/2023 | ENGR Engineering Final | Re-inspection required | install rip wrap per plan, specifications, and slope to avoid ponding. Note, Grading contractor is no longer on site. Landscaping contractor is completing the remainder of the Grading work. Please schedule inspections on a regular basis, as work is being installed. |
|
11/30/2023 | ENGR Engineering Final | Re-inspection required | rip wrap in section 3 is not installed for detail on page 8. Please provide revisions for any changes. Ponding is not allowed. |