Inspection Status: Complete (Recurring)
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/19/2022 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Conversation with Lorenzo at 245-5064 Dirtworks contract. Requested contractor schedule inspections biweekly. Assisted with schedule requirements. |
| 12/15/2021 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Phone conversation with Chip at 237-7522 with dirt works at about the Matney homes project on Silverbell. Chip will have his foreman schedule the required inspections through the automated system.
|