Permit: DP20-0166
Permit Details
Status:
Issued
Type:
Development Package
Address:
8800 E OLD VAIL RD
Address NEW:
8800 E OLD VAIL RD
Apply Date:
08/20/2020
Applicant:
Description:
SITE/GRADING/SWPPP/FLOODPLAIN : RV Storage - Tucson.
Permit Reviews
Permit Number - DP20-0166
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP/FLOODPLAIN : RV Storage - Tucson.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/01/2021 | DEV PKG - RESUBMITTAL | 03/10/2021 | COMPLETED |
| 07/22/2020 | DEV PKG - OK TO SUBMIT | 08/26/2020 | COMPLETED |
| 08/26/2020 | DEV PKG | 10/16/2020 | COMPLETED |
| 09/16/2021 | DEV PKG - OK TO SUBMIT | 10/07/2021 | COMPLETED |
| 10/07/2021 | REVISION - - 1ST | 10/18/2021 | COMPLETED |
| 10/20/2021 | DEV PKG - OK TO SUBMIT | 11/12/2021 | COMPLETED |
| 11/10/2020 | DEV PKG - RESUBMITTAL | 01/18/2021 | COMPLETED |
| 11/12/2021 | REVISION - - 2ND | 11/19/2021 | STOPPED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0166
Permite Description: SITE/GRADING/SWPPP/FLOODPLAIN : RV Storage - Tucson.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
| 10/27/2022 | ENGR Grading Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0166
Permit Description: SITE/GRADING/SWPPP/FLOODPLAIN : RV Storage - Tucson.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 06/10/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - APPROVED AT THIS TIME. I MET WITH THE CONTRACTOR, SUBCONTRACTOR(KEG), AND THE LANDSCAPE ARCHITECT REPRESENTATIVE/REBECCA AND DISCUSSED THE NEEDS FOR THIS SITE. THE SUBCONTRACTOR(KEG) WILL BE STARTING THE GRUBBING OF THE SITE NEXT WEEK ALONG WITH SALVAGING OF ALL PLANTS FOR THIS SITE. THE LANDSCAPE CONTRACTOR(SANTA RITA) WILL BE WORKING WITH THE PEOPLE FROM KIMBERLY HORN TO ENSURE ALL THE PLANTS ARE SALVAGED CORRECTLY AND THAT THE PLANTS ARE TAGGED AS THEY ARE PLACED INTO THE TEMPORARY NURSERY ALONG THE EASTERN BOUNDARY. ONCE THE NURSERY IS COMPLETE WE WILL VERIFY THAT ALL THE PLANTS ARE THERE.} |
|
| 07/29/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/29/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved} | |
| 08/10/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 07/29/2022; Status: Denied; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Denied. Erosion has exposed plants roots and irrigation systems in basin area } |
|
| 08/10/2022 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 07/29/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Partially approved.} | |
| 08/10/2022 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 07/29/2022; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Not ready. Provide not.} | |
| 08/19/2022 | COT - ENGR - Signage Final | Passed | {Activity date: 08/19/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 08/17/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN RESCHEDULE INSPECTION.NEED GATED CODE AND CONTRACTOR ON SITE.} ; {Activity date: 08/10/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/NO BRAKER FOR SIGN AND NO LOCK OUT} ; {Activity date: 07/29/2022; Status: Denied; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Denied. Trash enclosure built without inspection and missing bollards. Riprap level is too high at basin inlets and is causing erosion. Basin has standing water however less than 12 hours since last rain event. Monitor basin to see that water level recedes within 24 hours. Correct erosion and landscaping in basin area. Remove all construction debris located around site. Install accessible signage and wheel stop. Remove conduit at ground level at gate. Provide notice of termination for SWPPP permit.} |
|
| 08/22/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/22/2022; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - } ; {Activity date: 08/16/2022; Status: Cancelled; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CONTRACTOR CALL AND NEED TO RESCHEDULE.} ; {Activity date: 07/29/2022; Status: Approved; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 04/07/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CONCERNS AT IS TIME} ; {Activity date: 12/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN CN GOOD AS OF TODAY GRADING THE PARKING LOT FOR BLACK TOP.} ; {Activity date: 12/13/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 11/23/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /GRADING THE EAST END OF THE PARKING LOT. } ; {Activity date: 11/22/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 11/02/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ PLANI THE TREES IN THE BASIN AREAS AND INSTALLED SOME RIP RAP ON THE SOUTHEAST AREA. } ; {Activity date: 11/01/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 10/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /EVERTING GOOD AT IS TIME.} ; {Activity date: 10/18/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 10/06/2021; Status: Basin in Good Condition; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - IS GOOD AT IS TIME. } ; {Activity date: 09/15/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD AT IS TIME} ; {Activity date: 08/26/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /NEED TO MAINTENANCE ON THE SILT FENCING. } ; {Activity date: 08/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /CUTTING SUBGRADE} ; {Activity date: 07/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/ EVERYTHING LOOKS GOOD} ; {Activity date: 07/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/ INSTALLING THE SILT FENCE ON THE SOUTH END AND THE WEST END OF PROPERTY .MOVING THE PLANT TO THE NURSERY} ; {Activity date: 06/28/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, ADVISED THE CONTRACTORS (KEG) REPRESENTATIVE TO MAKE SURE THEY HAVE THEIR WATER TRUCK KEEP THE ROADWAY AND SITE WORK WATERED TO PREVENT DUST. I REMINDED THEM OF A PREVIOUS COMPLAINT ABOUT THE DUST BEING GENERATED FROM THIS SITE.} |