Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/10/2021 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by VLEON1 - APPROVED AT THIS TIME.
I MET WITH THE CONTRACTOR, SUBCONTRACTOR(KEG), AND THE LANDSCAPE ARCHITECT REPRESENTATIVE/REBECCA AND DISCUSSED THE NEEDS FOR THIS SITE. THE SUBCONTRACTOR(KEG) WILL BE STARTING THE GRUBBING OF THE SITE NEXT WEEK ALONG WITH SALVAGING OF ALL PLANTS FOR THIS SITE. THE LANDSCAPE CONTRACTOR(SANTA RITA) WILL BE WORKING WITH THE PEOPLE FROM KIMBERLY HORN TO ENSURE ALL THE PLANTS ARE SALVAGED CORRECTLY AND THAT THE PLANTS ARE TAGGED AS THEY ARE PLACED INTO THE TEMPORARY NURSERY ALONG THE EASTERN BOUNDARY. ONCE THE NURSERY IS COMPLETE WE WILL VERIFY THAT ALL THE PLANTS ARE THERE. |