Permit: DP20-0166

Parcel: 141210270


Addresses:

8800 E OLD VAIL RD

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Date Description Inspector Results Comments
08/22/2022 SITE - Stormwater Follow-up DROBERT5 Approved Entered by DROBERT5 -
08/16/2022 SITE - Stormwater Follow-up MHERNANDEZ Cancelled Entered by NGARCIA3 - CONTRACTOR CALL AND NEED TO RESCHEDULE.
07/29/2022 SITE - Stormwater Follow-up BBENEDON Approved Entered by NGARCIA3 - Approved
04/07/2022 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by NGARCIA3 - CN /NO CONCERNS AT IS TIME
12/14/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN CN GOOD AS OF TODAY GRADING THE PARKING LOT FOR BLACK TOP.
12/13/2021 SITE - Stormwater Follow-up IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
11/23/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN /GRADING THE EAST END OF THE PARKING LOT.
11/22/2021 SITE - Stormwater Follow-up IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
11/02/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by NGARCIA3 - CN/ PLANI THE TREES IN THE BASIN AREAS AND INSTALLED SOME RIP RAP ON THE SOUTHEAST AREA.
11/01/2021 SITE - Stormwater Follow-up IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
10/19/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by NGARCIA3 - CN /EVERTING GOOD AT IS TIME.
10/18/2021 SITE - Stormwater Follow-up IVR USER Cancelled Entered by IVR USER - IVRS - AP canceled
10/06/2021 SITE - Stormwater Follow-up MHERNANDEZ Basin in Good Condition Entered by RSALDAT1 - IS GOOD AT IS TIME.
09/15/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by NGARCIA3 - CN /GOOD AT IS TIME
08/26/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by VVERA1 - CN /NEED TO MAINTENANCE ON THE SILT FENCING.
08/12/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN /CUTTING SUBGRADE
07/28/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN/ EVERYTHING LOOKS GOOD
07/14/2021 SITE - Stormwater Follow-up MHERNANDEZ Continued Entered by RSALDAT1 - CN/ INSTALLING THE SILT FENCE ON THE SOUTH END AND THE WEST END OF PROPERTY .MOVING THE PLANT TO THE NURSERY
06/28/2021 SITE - Stormwater Follow-up DROBERTS Continued Entered by VLEON1 - CONTINUED, ADVISED THE CONTRACTORS (KEG) REPRESENTATIVE TO MAKE SURE THEY HAVE THEIR WATER TRUCK KEEP THE ROADWAY AND SITE WORK WATERED TO PREVENT DUST. I REMINDED THEM OF A PREVIOUS COMPLAINT ABOUT THE DUST BEING GENERATED FROM THIS SITE.