Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
4241 N ORACLE RD
Address NEW:
4241 N ORACLE RD
Apply Date:
12/20/2019
Applicant:
Description:
SITE/GRADING - Panda Express, new restaurant.

Permit Reviews

Permit Number - DP19-0310
Permit Status: Complete
Permit Description: SITE/GRADING - Panda Express, new restaurant.
Start Date Submittal Complete Date Status  
01/30/2020 DEV PKG 03/12/2020 COMPLETED Review Details
03/18/2020 DEV PKG - RESUBMITTAL 04/16/2020 COMPLETED Review Details
04/21/2020 DEV PKG - RESUBMITTAL 05/18/2020 COMPLETED Review Details
05/19/2020 DEV PKG - RESUBMITTAL 05/20/2020 COMPLETED Review Details
11/21/2019 DEV PKG - OK TO SUBMIT 12/24/2019 COMPLETED Review Details
12/30/2019 DEV PKG - OK TO SUBMIT 01/30/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP19-0310
Permit Description: SITE/GRADING - Panda Express, new restaurant.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/08/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/08/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. Adam with Haworth at 602-332-5019. Install stormwater controls and concrete containment as needed. Post address. Schedule inspections velocity hall. Inspections will be done remotely. Contact information exchanged. CES civil engineers. Alex Hines manager. HAWORTH Company602-861-1080.}
12/03/2020 SITE - Stormwater Follow-up Passed {Activity date: 12/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 10/27/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Concrete containment in place.} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Discharge from site into catch basin in private parking area to the west
Large pile of material next to modified existing catch basin in drive-through

} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. All issues have been corrected.

} ; {Activity date: 09/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time.} ; {Activity date: 07/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues. Site opens into private parking lot.} ; {Activity date: 07/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Controls in place} ; {Activity date: 07/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Controls have been installed at catch basin. No issues at this time. By concrete containment water protections As needed
Side entrance is on two.}
12/03/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 12/03/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - } ; {Activity date: 07/15/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Concrete containment station in place} ; {Activity date: 07/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Controls in place} ; {Activity date: 07/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Controls have been installed at catch basin. No issues at this time. By concrete containment water protections As needed
Side entrance is on two.}
12/30/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/30/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - Approved. Corrections have been completed by Adam with Haworth.}
12/31/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 12/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}
12/31/2020 ENGR Engineering Final Passed {Activity date: 12/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 12/29/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Correction of accessible parking spaces in progress at this time}
12/31/2020 ENGR Grading Final Passed {Activity date: 12/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 12/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Unscheduled courtesy inspection for Adam with Haworth construction. Please schedule all remaining inspections required to complete Development package permit.} ; {Activity date: 10/27/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Installing concrete drive-through} ; {Activity date: 10/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - UNSCHEDULED INSPECTION. UNDERGROUND UTILITY WORK IN PROGRESS. CONCRETE WORK NEXT TO BUILDING.} ; {Activity date: 10/02/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No grading activity at this time. Building progress only} ; {Activity date: 09/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - continue. Contractor is Installing site utilities. And starting final grade.}
12/31/2020 SITE - Stormwater Final Inspection Passed {Activity date: 12/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 12/03/2020; Status: Denied; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Denied. This was an unscheduled final inspection. Project appears to be nearing completion, few inspections have been scheduled throughout the project. There’s no activity on site at this time.
Accessible parking was checked and is out of compliance. Stormwater catch basin on site and immediately downstream in the parking area were both checked and both contain construction debris. Existing downstream catch basin has standing water as well. This was due to construction debris from this project. Landscaping and final grading has not been Completed, there is a material stock pile in the parking lot. There is also electric utility work On going

} ; {Activity date: 09/23/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. At final check for debris in catch basin west of jobsite.}
12/31/2020 COT - ENGR - Signage Final Passed {Activity date: 12/31/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved}

Documents

File Name Document Type  
1-13 OF 13.PDF DEVELOPMENT PACKAGE VIEW
PERMIT AND CONTRACTOR LETTER.PDF DOCUMENTS VIEW
COMMENTS-RESPONSE LETTER, 05.19.2020.PDF DOCUMENTS VIEW
COMMENTS FROM CITY OF TUCSON, 04.21.2020.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
REV COMMENTS, 03.18.2020.PDF DOCUMENTS VIEW