Permit: DP19-0310

Parcel: 104092250


Addresses:

4241 N ORACLE RD

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/30/2020 ENGR Grading Final DROBERTS Approved Entered by PAHUMAD1 -
09/25/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by RSALDAT1 - Not ready. trash enclosure Slab has been poured without inspection, Contractor has not graded areas including trash closure approach.
07/31/2020 ENGR Grading Final BBENEDON Partial Approval Entered by RSALDAT1 - Partially approved. Pregrout to 4’
07/08/2020 ENGR Grading Final BBENEDON Partial Approval Entered by JSCHNEI2 - Partially approved. Trash enclosure footings.
12/23/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - Approved. Conversation with Adam from Haworth at the panda express. Job has been on hold waiting for electrical connections. Contractor has failed to call in for development package inspections and was informed today that his accessible parking spaces exceed the maximum allowed slope and require correction. Adam will make required corrections, clean all mud and debris from catch basins affected from Construction and schedule all remaining required inspections from development package permits
10/30/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. No activity on site at this time. Project appears to be nearing completion
12/29/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - Approved
12/31/2020 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - Approved
12/23/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Unscheduled courtesy inspection for Adam with Haworth construction. Please schedule all remaining inspections required to complete Development package permit.
10/27/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Installing concrete drive-through
10/06/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - UNSCHEDULED INSPECTION. UNDERGROUND UTILITY WORK IN PROGRESS. CONCRETE WORK NEXT TO BUILDING.
10/02/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. No grading activity at this time. Building progress only
09/23/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - continue. Contractor is Installing site utilities. And starting final grade.