Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/30/2020 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by PAHUMAD1 - |
| 09/25/2020 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. trash enclosure Slab has been poured without inspection, Contractor has not graded areas including trash closure approach. |
| 07/31/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Pregrout to 4’ |
| 07/08/2020 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by JSCHNEI2 - Partially approved. Trash enclosure footings.
|
| 12/23/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved. Conversation with Adam from Haworth at the panda express. Job has been on hold waiting for electrical connections. Contractor has failed to call in for development package inspections and was informed today that his accessible parking spaces exceed the maximum allowed slope and require correction. Adam will make required corrections, clean all mud and debris from catch basins affected from Construction and schedule all remaining required inspections from development package permits |
| 10/30/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. No activity on site at this time. Project appears to be nearing completion |
| 12/29/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved |
| 12/31/2020 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by RSALDAT1 - Approved |
| 12/23/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Unscheduled courtesy inspection for Adam with Haworth construction. Please schedule all remaining inspections required to complete Development package permit. |
| 10/27/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Installing concrete drive-through |
| 10/06/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by PAHUMAD1 - UNSCHEDULED INSPECTION. UNDERGROUND UTILITY WORK IN PROGRESS. CONCRETE WORK NEXT TO BUILDING. |
| 10/02/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by JSCHNEI2 - Continued. No grading activity at this time. Building progress only |
| 09/23/2020 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - continue. Contractor is Installing site utilities. And starting final grade. |