Permit: DP19-0250
Permit Details
Apply Date:
10/10/2019
Applicant:
Lisa Bowers
Description:
SITE/GRADING - La Frontera Alborada Apartments, single-story.
Permit Reviews
Permit Number - DP19-0250
Permit Status: Complete
Permit Description: SITE/GRADING - La Frontera Alborada Apartments, single-story.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/15/2020 | DEV PKG - RESUBMITTAL | 01/30/2020 | COMPLETED |
01/29/2020 | DEV PKG - RESUBMITTAL | 02/04/2020 | COMPLETED |
02/06/2020 | DEV PKG - RESUBMITTAL | 02/12/2020 | COMPLETED |
09/12/2019 | DEV PKG - OK TO SUBMIT | 10/16/2019 | COMPLETED |
10/17/2019 | DEV PKG | 11/21/2019 | COMPLETED |
12/06/2019 | DEV PKG - RESUBMITTAL | 01/08/2020 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP19-0250
Permit Description: SITE/GRADING - La Frontera Alborada Apartments, single-story.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2020 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 08/17/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Approved. Roy with Canyon at272-7910. Cypress engineering. La Frontera apartments. Eagle rock. Site is less than 1 acre. Provide stormwater controls at the north west corner. Remove loose rocks that have spilled into the street. Provide concrete washout containment. Schedule stormwater followup inspections biweekly. And schedule grading intermediate inspections for trash enclosure, grading and stormwater piping. } ; {Activity date: 08/14/2020; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Not ready. Unscheduled courtesy inspection. Roy 272-7910 with Canyon just took over this job and will schedule for preconstruction meeting.} |
|
01/22/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/22/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 09/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Trackout protection and concrete washout in place some waddle installed At Northwest perimeter. Install additional model as needed to protect material stock piles } ; {Activity date: 08/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Some controls have been installed at northwest corner however large stock pile of material is unprotected in that corner. Track out protection is in place.} |
|
01/29/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/26/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. Trees have been installed. Contractors working on ground covering} | |
01/29/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
01/29/2021 | ENGR Engineering Final | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/21/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VLEON1 - Not ready. Depress landscaped areas as required, complete all ground coverings, and rip rap as shown, Correct existing basin and south end of property. Jack with Canyon} | |
01/29/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE NO ISSUES AT THIS TIME NO ACTIVITY, GATE LOCKED} ; {Activity date: 12/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Contractor sweeping sidewalk along Oracle. Work within the right of way and Blacklidge. Track out contained within private drive} ; {Activity date: 12/18/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Waddle along north and northwest perimeter have been displaced by work within the right of way. } ; {Activity date: 10/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. No track out present} ; {Activity date: 09/24/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Roy stated that City of Tucson performing work at Northwest portion of site and responsible for dirt accumulation. } ; {Activity date: 09/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Track out and rocks noted on Blacklidge at temporary site entrance. Large material Pio on site. Clean and protect as needed} ; {Activity date: 09/03/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Entrance has been relocated and Street has been cleaned.} ; {Activity date: 08/26/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS CONTINUED AT THIS TIME, NO STORMWATER CONCERNS} |
|
01/29/2021 | ENGR Grading Final | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/26/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. No corrections have been made yet at south basin requiring repair.} ; {Activity date: 01/21/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - PARTIAL, WATER HAVERSTING BASING, PROVEIDE RIP RAP AT INLET, PROVIDE DEPRESSED LANDSCAPED AREAS AS REQUIRED PER PLANS} ; {Activity date: 10/27/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Accessible walkways around building. Andy Wilson with Canyon builders.} ; {Activity date: 10/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - CONTINUED. CONSTRUCTING PERIMETER WALL.} ; {Activity date: 10/22/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - VERTICAL CONSTRUCTION IS HAPPENING ON THIS SITE MAINLY, ALSO LOOKED AT THE TRASH ENCLOSURE.} ; {Activity date: 09/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Building construction in progress } ; {Activity date: 08/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Utility work in progress and in the right of way. Road closure in place.} |
|
01/29/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
01/29/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 01/29/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |