Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP19-0250
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/17/2020 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Approved | Entered by JSCHNEI2 - Approved. Roy with Canyon at272-7910. Cypress engineering. La Frontera apartments. Eagle rock. Site is less than 1 acre. Provide stormwater controls at the north west corner. Remove loose rocks that have spilled into the street. Provide concrete washout containment. Schedule stormwater followup inspections biweekly. And schedule grading intermediate inspections for trash enclosure, grading and stormwater piping. |
08/14/2020 | PDSD Engineering Division Pre-Construction SITE | BBENEDON | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Unscheduled courtesy inspection. Roy 272-7910 with Canyon just took over this job and will schedule for preconstruction meeting. |