Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP19-0250
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/29/2021 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
01/21/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by VLEON1 - Not ready. Depress landscaped areas as required, complete all ground coverings, and rip rap as shown, Correct existing basin and south end of property. Jack with Canyon |
01/29/2021 | ENGR Engineering Final | DROBERTS | Approved | Entered by DROBERT5 - |
01/28/2021 | ENGR Engineering Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE |
01/20/2021 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Andy Wilson with Canyon builders 312-1663, Jack 272-0748. Complete all work for the site and schedule all remaining inspections from the development package permit. Grading, landscaping work is still in progress. |