Permit: DP19-0250

Parcel: 10712170G


Addresses:

2940 N ORACLE RD


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP19-0250

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
01/20/2021 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - . Approved.
01/20/2021 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - . Approved
12/29/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Building construction in progress. Sidewalk construction within the ROW
10/27/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - Continued. New superintendent on site is Andy Wilson with Canyon at 312-1663
10/12/2020 ENGR Grading Final DROBERTS Partial Approval Entered by VFLORES1 - OK TO POUR THE CONCRETE FOOTER FOR THE TRASH ENCLOSURE.
01/21/2021 ENGR Grading Final BBENEDON Approved Entered by RSALDAT1 - Approved
10/22/2020 ENGR Grading Final DROBERTS Partial Approval Entered by RSALDAT1 - IS PARTIAL AT THIS TIME, OK TO PLACE CONCRETE FOR THE FLOOR SLAB.ONCE REBAR MAT HAS BEEN SUPPORTED WITH ADDITIONAL CHAIRS, PENDING PHOTOS. THE CONTRACTOR HAS CONSTRUCTED THE WALLS FULLY SO THE GROUT FOR THE WALLS CAN NOT BE PLACED TILL THE KNOCK AT HOLES FOR GROUT HAS BEEN PROVIDED TO VERIFY GROUT PLACEMENT. I HAVE ASKED THEM TO PHOTOGRAPH THE HOLES AND THE PLACEMENT OF THE REBAR FOR THE REQUIRED BOND BEAM ATTHE TOP OF THE WALLS.
09/24/2020 ENGR Grading Final BBENEDON Not ready for Inspection Entered by JSCHNEI2 - Not ready. Contractor has not yet started trash enclosure.
01/29/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
01/26/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - Continued. No corrections have been made yet at south basin requiring repair.
01/21/2021 ENGR Grading Final BBENEDON Partial Approval Entered by VLEON1 - PARTIAL, WATER HAVERSTING BASING, PROVEIDE RIP RAP AT INLET, PROVIDE DEPRESSED LANDSCAPED AREAS AS REQUIRED PER PLANS
10/27/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Accessible walkways around building. Andy Wilson with Canyon builders.
10/23/2020 ENGR Grading Final BBENEDON Continued Entered by PAHUMAD1 - CONTINUED. CONSTRUCTING PERIMETER WALL.
10/22/2020 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - VERTICAL CONSTRUCTION IS HAPPENING ON THIS SITE MAINLY, ALSO LOOKED AT THE TRASH ENCLOSURE.
09/23/2020 ENGR Grading Final BBENEDON Continued Entered by JSCHNEI2 - Continued. Building construction in progress
08/20/2020 ENGR Grading Final BBENEDON Continued Entered by RSALDAT1 - Continued. Utility work in progress and in the right of way. Road closure in place.