Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
555 S CHERRY AV
Address NEW:
555 S CHERRY AV
Apply Date:
07/24/2019
Applicant:
Description:
SITE/GRADING/SWPPP - Cherry mixed use lofts, residential and commercial.

Permit Reviews

Permit Number - DP19-0175
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - Cherry mixed use lofts, residential and commercial.
Start Date Submittal Complete Date Status  
02/09/2022 DEV PKG - OK TO SUBMIT 03/10/2022 COMPLETED Review Details
03/10/2022 REVISION - - 2ND 04/08/2022 COMPLETED Review Details
05/02/2022 REVISION - - 2ND 08/08/2022 COMPLETED Review Details
05/11/2021 DEV PKG - OK TO SUBMIT 06/02/2021 COMPLETED Review Details
06/02/2021 REVISION - - 1ST 06/02/2021 COMPLETED Review Details
06/24/2019 DEV PKG - OK TO SUBMIT 07/30/2019 COMPLETED Review Details
07/29/2019 DEV PKG 08/29/2019 COMPLETED Review Details
09/27/2019 DEV PKG - RESUBMITTAL 10/30/2019 COMPLETED Review Details
10/04/2021 REVISION - - 1ST 11/10/2021 COMPLETED Review Details
11/05/2019 DEV PKG - RESUBMITTAL 01/17/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP19-0175
Permit Status: Issued
Permit Description: SITE/GRADING/SWPPP - Cherry mixed use lofts, residential and commercial.
Total Outstanding Activity Conditions - 1
Date Name
11/18/2019 NO C OF O UNTIL:Recorded document for Abandonment of a portion of 16th St currently shown as “to be vacatedRecorded document conveying title from City of Tucson to Cherry Lofts, LLC of 5405 sq.ft.+ currently shown as “to be vacated

Outstanding Inspections

Permit Status: Issued
Permit Number: DP19-0175
Permite Description: SITE/GRADING/SWPPP - Cherry mixed use lofts, residential and commercial.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: DP19-0175
Permit Description: SITE/GRADING/SWPPP - Cherry mixed use lofts, residential and commercial.
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/25/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/25/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Scott with desert earth. 520-609-2593 Brian with Desert Earth at 307-4459. Project has underground storm water piping with manholes. Riprap, water harvesting. The right of way extends 5 feet into the property.
Many buildings and a trash enclosure. Asphalt parking and bicycle parking shown on approved plans.
Please post your address. Please schedule stormwater follow up inspections biweekly. Please call for intermediate grading inspections on a regular basis during installations. Keep the street clean during construction.}
01/13/2022 PDSD Site/Engineering Division - NPPO Passed {Activity date: 01/13/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED}
01/13/2022 SITE - Stormwater Follow-up Passed {Activity date: 01/13/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} ; {Activity date: 08/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/ NO ACTIVITY} ; {Activity date: 08/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN INSTALLING DOWN SPOUT.} ; {Activity date: 08/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN INSTALLING DOWN SPOUT.} ; {Activity date: 05/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 555 S CHERRY AV} ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, FOR 595 S CHERRY AVE NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, FOR 585 S CHERRY AV NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED, FOR 555 S CHERRY AV NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 10/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by PAHUMAD1 - Continued. Minor track out

} ; {Activity date: 09/21/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Minor track out noted on Cherry. Track out protection rock is diminishing.} ; {Activity date: 09/09/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Minor track out noted} ; {Activity date: 08/11/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continue.} ; {Activity date: 08/06/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. Only concern is the large pile of dirt at the north portion of the site. Waddle installed.} ; {Activity date: 07/27/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, THERE APPEARS TO BE NO CONCERN AT THIS TIME. THE SITE CONTROLS ARE IN PLACE AND APPEAR TO BE WORKING AS DESIGNED.

} ; {Activity date: 07/27/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, THERE APPEARS TO BE NO CONCERN AT THIS TIME. THE SITE CONTROLS ARE IN PLACE AND APPEAR TO BE WORKING AS DESIGNED.} ; {Activity date: 07/27/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by JSCHNEI2 - CONTINUED AT THIS TIME, THERE APPEARS TO BE NO CONCERN AT THIS TIME. THE SITE CONTROLS ARE IN PLACE AND APPEAR TO BE WORKING AS DESIGNED.} ; {Activity date: 07/23/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. No issues at this time.} ; {Activity date: 07/14/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by JSCHNEI2 - Continued. Minor track out} ; {Activity date: 06/25/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Backfill of storm drains and domestic sewer. Installing domestic water mains.} ; {Activity date: 06/22/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continue. Minor track out} ; {Activity date: 06/12/2020; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION.} ; {Activity date: 06/08/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues. Bryan with Desert Earth

} ; {Activity date: 05/29/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Brian with desert earth is sweeping the street as needed.} ; {Activity date: 05/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues at this time. Protections are still in place} ; {Activity date: 05/13/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - No issues at this time. Protections are still in place} ; {Activity date: 05/05/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Minor track out noted

} ; {Activity date: 04/20/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DROBERT5 - No issues at this time. The street has been swept.} ; {Activity date: 03/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 03/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - } ; {Activity date: 03/19/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - No issues at this time} ; {Activity date: 03/12/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - There is minor track out at site entrance to be noted. Additionally the waddle installed along the property line has been removed. Brian with desert earth. Please install controls as necessary with the rain event in the forecast.} ; {Activity date: 03/12/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - There is minor track out at site entrance to be noted. Additionally the waddle installed along the property line has been removed. Brian with desert earth. Please install controls as necessary with the rain event in the forecast.} ; {Activity date: 03/12/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - There is minor track out at site entrance to be noted. Additionally the waddle installed along the property line has been removed. Brian with desert earth. Please install controls as necessary with the rain event in the forecast.} ; {Activity date: 02/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Minor track out noted.} ; {Activity date: 02/26/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Minor track out On cherry at 16th St.} ; {Activity date: 02/26/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by SFLORES2 - Minor track out On cherry at 16th St.}
01/13/2022 SITE - Stormwater Final Inspection Passed {Activity date: 01/13/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED}
01/13/2022 COT - ENGR - Signage Final Passed {Activity date: 01/13/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED}
01/18/2022 ENGR Grading Final Passed {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/18/2022 SITE - Stormwater Setup and Controls Passed {Activity date: 01/18/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/28/2020; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has moved waddle back from the fencing. Go track out controls in place yet} ; {Activity date: 02/25/2020; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - }

Documents

File Name Document Type  
ARCHITECTURAL PLAN SHEETS, 05.03.22.PDF DOCUMENTS VIEW
REV-2_2_ COMMENT RESPONSES LETTER.PDF DOCUMENTS VIEW
DP19-0175 REVISION 2 LETTER.PDF DOCUMENTS VIEW
ONLINE PAGE, RECVD 12.08.21.PDF DOCUMENTS VIEW
ENGINEERS CERTIFICATION LETTER, 12.08.21.PDF DOCUMENTS VIEW
DP19-0175 RECORD DRAWINGS FLATTENED.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 10.01.21.PDF DOCUMENTS VIEW
DP19-0175 REVISION 1_2 REQUEST LETTER.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 05.11.21.PDF DOCUMENTS VIEW
DP19-0175 REVISION 1 REQUEST LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
APPLICATION-CORRECTED.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
NPPP EXCEPTION APPLICATION.PDF DOCUMENTS VIEW
NPPP EXCEPTION LETTER.PDF DOCUMENTS VIEW
STORMWATER_PREVENTION_PLAN.PDF DOCUMENTS VIEW
TRAFFIC_STATEMENT_2019-06-11.PDF DOCUMENTS VIEW
TEP FACILITIES MAP, 08.06.19.PDF DOCUMENTS VIEW
PIMACO ADDRESSING REVIEW, 08.23.19.PDF DOCUMENTS VIEW
ACCESS MAINT LEGAL-SIGNED.PDF DOCUMENTS VIEW
COMMENT_RESP_LTR, 09.17.19.PDF DOCUMENTS VIEW
ST LANDSC BORDER EMAIL.PDF DOCUMENTS VIEW
REZONING MEMO COMPL W COND 2019-09-17.PDF DOCUMENTS VIEW
TIA - FINAL 10-16-2019.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 10.29.19.PDF DOCUMENTS VIEW
FAA DETERMINATION LETTER.PDF DOCUMENTS VIEW
LOT COMBO.PDF DOCUMENTS VIEW
1-20 OF 20.PDF DEVELOPMENT PACKAGE VIEW