Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/25/2020 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - Scott with desert earth. 520-609-2593 Brian with Desert Earth at 307-4459. Project has underground storm water piping with manholes. Riprap, water harvesting. The right of way extends 5 feet into the property.
Many buildings and a trash enclosure. Asphalt parking and bicycle parking shown on approved plans.
Please post your address. Please schedule stormwater follow up inspections biweekly. Please call for intermediate grading inspections on a regular basis during installations. Keep the street clean during construction. |