Permit: DP19-0125
Permit Details
Apply Date:
05/20/2019
Applicant:
Lisa Bowers
Description:
*Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
Permit Reviews
Permit Number - DP19-0125
Permit Status: Issued
Permit Description: *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/10/2020 | DEV PKG - RESUBMITTAL | 02/28/2020 | COMPLETED |
03/06/2020 | DEV PKG - RESUBMITTAL | 03/09/2020 | COMPLETED |
03/11/2022 | DEV PKG - OK TO SUBMIT | 03/16/2022 | COMPLETED |
04/25/2022 | DEV PKG - OK TO SUBMIT | 04/27/2022 | COMPLETED |
05/20/2019 | DEV PKG - OK TO SUBMIT | 05/22/2019 | COMPLETED |
05/23/2019 | DEV PKG | 07/10/2019 | COMPLETED |
05/25/2022 | REVISION - - 1ST | 07/01/2022 | COMPLETED |
07/08/2022 | REVISION - - 1ST | 08/01/2022 | COMPLETED |
08/26/2019 | DEV PKG - RESUBMITTAL | 10/16/2019 | COMPLETED |
02/14/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/19/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP19-0125
Permite Description: *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/26/2022 | SITE - Zoning Final | N/A | Not Ready | |
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | |
11/15/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Stormwater controls and follow up inspections. Continued. No issues or concerns at this time. |
10/27/2022 | ENGR Grading Final | N/A | Not Ready | |
05/01/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | |
03/14/2023 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | |
Consultation SITE | N/A | Not Ready | SITE LANDSCAPE/NPPO SECTION INSPECTION NOTES: ALL OF THE FOLLOWING PUNCH LIST ITEMS CAN BE FOUND ON THE REDLINED PLAN ATTACHED, ALONG WITH PHOTO DOCUMENTATION. WORKING FROM NORTH TO SOUTH 1. Missing vine at the north east wall. Implement the vine planting. 2. Two Live Oaks are planted off center within the steel tree grate. Re-plant the two trees to be centered in the grate. 3. Foundation plantings west of the sidewalk on the east wall are dead, or were not planted per the approved plans. Review the plans and replace the dead and missing plants at 24 inches on center along the east wall. See note 18 on sheet L2 of the approved plans. 4. Still missing Euphorbia plantings at the fire lane marked curb planter area near the entry to the building. We approved the tree removal from the area due to the lighting conflict, but the other plants are required in that area. Review the approved landscape plan sheet L2 and add the plants to this area. If you have any questions about these punch list items, I can be reached at the email below. Thank you. Chad Keller, RLA chad.keller@tucsonaz.gov |
Completed Inspections
Permit Status: Issued
Permit Number: DP19-0125
Permit Description: *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
07/03/2023 | SITE - Stormwater Setup and Controls | Passed | ||
08/19/2024 | COT - ENGR - Signage Final | Passed | ||
10/08/2024 | PDSD Site/Engineering Division - Landscaping | Passed |
Scheduled Inspections
Scheduled Inspections - DP19-0125
Status: Issued
Description: *Revision #2 started 2/14/24* Site/Grading/SWPPP/FUP - Partners on Fourth PAD, new mixed-use 13-story building.
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/29/2024 | Consultation SITE | Scheduled |