Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
SITE - Stormwater Setup and Controls |
|
Not Ready |
|
| 08/10/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Controls have been added at existing catch basin. |
| 07/29/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Track out and site Stormwater protections in place.
|
| 06/14/2023 |
SITE - Stormwater Setup and Controls |
|
Partial Pass |
|
| 07/03/2023 |
SITE - Stormwater Setup and Controls |
|
Passed |
|
| 11/15/2022 |
SITE - Stormwater Setup and Controls |
|
Complete (Recurring) |
Stormwater controls and follow up inspections. Continued. No issues or concerns at this time. |