Permit: DP19-0125

Parcel: 11706077R


Addresses:

211 N 4TH AV


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP19-0125

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
09/16/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. RCP piping progress
09/13/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. 2 Stormwater piping transitions to RCP. With first sections heading north.
08/23/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. East west run a 56 inch stormwater containment piping
08/22/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /INSTALLING 54” CMP
08/19/2022 ENGR Grading Final DROBERTS Continued Entered by VVERA1 - CONTINUED, NO ONE ON SITE WHEN THIS INSPECTION WAS PERFORMED DUE TO EARLIER RAINS
08/17/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN ‘INSTALLING 54” CMP TWO BARROWS.
08/16/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN ,INSTALLING 54” CMP
08/12/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. Continuation of 56 inch stormwater piping.
08/10/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. One section for each of the 2- 56 inch storm water pipes starting at the east side of the job site. Filter fabric and bedding material OK.
08/05/2022 ENGR Grading Final BBENEDON Partial Approval Entered by VVERA1 - Partially approved. Contractor starting at East end of dual 56 inch storm water holding tanks constructed of galvanized steel pipe. Bedding checked and confirmed. Installed as shown on city approved plan revision. Milton with Op.. Office directly north of northside entrance.
08/04/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Excavation for54 inch stormwater piping.
07/29/2022 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. Preconstruction meeting with Milton from opus at 602 510-2820 and Office to the north of site. Redline approved plans with any changes, revisions to follow.
04/11/2023 ENGR Grading Final Complete (Recurring)
05/01/2024 ENGR Grading Final Partial Pass
06/14/2023 ENGR Grading Final Complete (Recurring)
06/14/2023 ENGR Grading Final Complete (Recurring) Building progress
06/28/2023 ENGR Grading Final Complete (Recurring)
07/03/2023 ENGR Grading Final Not Ready Construction site and work is still ongoing. No one on site at this time.
07/03/2023 ENGR Grading Final Not Ready Construction work is still ongoing. No one on site at this time.
07/03/2023 ENGR Grading Final Not Ready Construction work is still ongoing. No one on site at this time.
07/03/2023 ENGR Grading Final Not Ready Construction work is still ongoing. No one on this site at this time.
08/09/2023 ENGR Grading Final Partial Pass
09/27/2023 ENGR Grading Final Partial Pass
12/12/2023 ENGR Grading Final Partial Pass Milton