Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
12/13/2018
Applicant:
Description:
SITE/GRADING/SWPPP - Foothills Storage.

Permit Reviews

Permit Number - DP18-0302
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP - Foothills Storage.
Start Date Submittal Complete Date Status  
02/19/2019 DEV PKG - RESUBMITTAL 03/26/2019 COMPLETED Review Details
03/18/2020 DEV PKG - OK TO SUBMIT 04/21/2020 COMPLETED Review Details
04/12/2019 DEV PKG - RESUBMITTAL 05/10/2019 COMPLETED Review Details
05/17/2019 DEV PKG - RESUBMITTAL 05/30/2019 COMPLETED Review Details
05/28/2020 DEV PKG - OK TO SUBMIT 06/29/2020 COMPLETED Review Details
06/29/2020 REVISION - - 1ST 07/28/2020 COMPLETED Review Details
08/04/2020 REVISION - - 1ST 09/30/2020 COMPLETED Review Details
11/14/2018 DEV PKG - OK TO SUBMIT 12/17/2018 COMPLETED Review Details
12/17/2018 DEV PKG 01/23/2019 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP18-0302
Permit Description: SITE/GRADING/SWPPP - Foothills Storage.
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/24/2019 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/24/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with general contractor on site walked site went over Approved plans.}
08/06/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 08/06/2020; Status: Approved; Inspector: RLeDonne; Comment: Entered by RLEDONN1 - }
08/06/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 08/06/2020; Status: Approved; Inspector: RLeDonne; Comment: Entered by RLEDONN1 - }
08/12/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/12/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 06/04/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Complete all work on approval plan before calling for final.
}
08/12/2020 SITE - Stormwater Follow-up Passed {Activity date: 08/12/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/30/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No track out onto Street from light on west side of site.} ; {Activity date: 07/16/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.

} ; {Activity date: 07/08/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Continue. No concerns at this time.} ; {Activity date: 09/09/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Still do not have Swppp information posted At gate.} ; {Activity date: 08/21/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with GC about concrete washout not on site. He assured me he would have a wash out before pouring concrete.} ; {Activity date: 08/06/2019; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Storm water controls in place. Stormwater information sign still not up at the entrance. Talk to general contractor he said it would be up by the end of the week.}
08/12/2020 SITE - Stormwater Final Inspection Passed {Activity date: 08/12/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/12/2020 COT - ENGR - Signage Final Passed {Activity date: 08/12/2020; Status: Approved; Inspector: Rledonne; Comment: Entered by RLEDONN1 - }
08/13/2020 COT - FCON - Sprinkler - Final Passed {Activity date: 08/13/2020; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - }
08/13/2020 COT - FCON - Fire - Final Passed {Activity date: 08/13/2020; Status: Approved; Inspector: MRoss; Comment: Entered by MROSS2 - }
08/28/2020 ENGR Engineering Final Passed {Activity date: 08/28/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Approved.} ; {Activity date: 08/26/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. Work has been completed on project. Provide certification letter from engineer of record that all grading and drainage and trashing closure has been Installed per approved plans For final.} ; {Activity date: 08/25/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Complete all striping for pedestrian pathway from building one to building two and three. Provide certification letter from engineer of Record for all grading and drainage has been installed per approved plans and for trashing closure construction that was never inspected by the city of Tucson.} ; {Activity date: 08/19/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready. Paving and striping contractor canceled.} ; {Activity date: 08/17/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by JSCHNEI2 - Not ready.Asphalt contractor not able to complete work for inspection.

} ; {Activity date: 08/06/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. Pedestrian pathway from building #1 to South side and west side of building number two cross slopes over 2%. Roof drains running over sidewalks and pedestrian pathways on all three buildings. No physical separation on any pedestrian pathways from building one to building two and three and around building three. Provide stabilization and stormwater temporary controls around stock pile on lot west of site. Remove all construction debris. Walked with Dave RobertsAnd contractors around site. And all comments made by Dave Roberts on DP permit and combination permit for building three.

} ; {Activity date: 08/05/2020; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Not ready. Leave all notes from last inspection. Gate code} ; {Activity date: 07/31/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Walk site with new GC went over CERT letter from engineer of record for all grading and drainage. All work was done per approved plans. Provide stabilization and clear or provide permit for stockpile west of site large open area.Remove all construction material from sidewalks to check slopes. Complete all work on approve plan before calling for final grading.} ; {Activity date: 06/04/2020; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RSALDAT1 - Partial approval. OK for TCO for building #1 only. Talk to general superintendent he mentioned changes to trashing closure. I told him he needed approval from environmental services. And all changes to approve plans provide COT approved revisions.

}

Documents

File Name Document Type  
COMMENT_RESPONSES, 07.31.20.PDF DOCUMENTS VIEW
RESPONSE LETTER, 06.25.20.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
CONTRACTOR LETTER OF INTENT.PDF DOCUMENTS VIEW
NOI_CERTIFICATE.PDF DOCUMENTS VIEW
APPLICATION FORM.PDF DOCUMENTS VIEW
1_ADDRESSING COMMENTS.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
PIMACOASSESSOR PARCEL CONSOL..PDF DOCUMENTS VIEW
COMMENT RESP LTR, 03.27.19.PDF DOCUMENTS VIEW
DETERMINATION_LTR, 03.12.19.PDF DOCUMENTS VIEW
ZONING_COMMENT RESPONSE.PDF DOCUMENTS VIEW
DRAINAGE_REPORT.PDF DOCUMENTS VIEW
RESPONSE LETTER - ENGINEERING.PDF DOCUMENTS VIEW
STORMWATER POLLUTION PREVENTION PLAN BOOKLET.PDF DOCUMENTS VIEW
ZONING_COND_RESPONSE.PDF DOCUMENTS VIEW
1-16 OF 16.PDF DEVELOPMENT PACKAGE VIEW