Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP18-0302
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/12/2020 | ENGR Engineering Final | Rledonne | Approved | Entered by RLEDONN1 - |
08/28/2020 | ENGR Engineering Final | RLEDONNE | Approved | Entered by RSALDAT1 - Approved. |
08/26/2020 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Partial approval. Work has been completed on project. Provide certification letter from engineer of record that all grading and drainage and trashing closure has been Installed per approved plans For final. |
08/25/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Complete all striping for pedestrian pathway from building one to building two and three. Provide certification letter from engineer of Record for all grading and drainage has been installed per approved plans and for trashing closure construction that was never inspected by the city of Tucson. |
08/19/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. Paving and striping contractor canceled. |
08/17/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by JSCHNEI2 - Not ready.Asphalt contractor not able to complete work for inspection. |
08/06/2020 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Partial approval. Pedestrian pathway from building #1 to South side and west side of building number two cross slopes over 2%. Roof drains running over sidewalks and pedestrian pathways on all three buildings. No physical separation on any pedestrian pathways from building one to building two and three and around building three. Provide stabilization and stormwater temporary controls around stock pile on lot west of site. Remove all construction debris. Walked with Dave RobertsAnd contractors around site. And all comments made by Dave Roberts on DP permit and combination permit for building three. |
08/05/2020 | ENGR Engineering Final | RLEDONNE | Not ready for Inspection | Entered by RSALDAT1 - Not ready. Leave all notes from last inspection. Gate code |
07/31/2020 | ENGR Engineering Final | RLEDONNE | Continued | Entered by RSALDAT1 - Walk site with new GC went over CERT letter from engineer of record for all grading and drainage. All work was done per approved plans. Provide stabilization and clear or provide permit for stockpile west of site large open area.Remove all construction material from sidewalks to check slopes. Complete all work on approve plan before calling for final grading. |
06/04/2020 | ENGR Engineering Final | RLEDONNE | Partial Approval | Entered by RSALDAT1 - Partial approval. OK for TCO for building #1 only. Talk to general superintendent he mentioned changes to trashing closure. I told him he needed approval from environmental services. And all changes to approve plans provide COT approved revisions. |