Permit: DP18-0302

Parcel: 11006009A

Inspection Status: Passed

Inspection History: SITE - Stormwater Follow-up

Permit Number - DP18-0302

Inspection Description - SITE - Stormwater Follow-up

Inspection Status - Passed

Date Description Inspector Results Comments
08/12/2020 SITE - Stormwater Follow-up Rledonne Approved Entered by RLEDONN1 -
07/30/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by JSCHNEI2 - Continue. No track out onto Street from light on west side of site.
07/16/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by JSCHNEI2 - Continue. No concerns at this time.
07/08/2020 SITE - Stormwater Follow-up RLEDONNE Continued Entered by JSCHNEI2 - Continue. No concerns at this time.
09/09/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Still do not have Swppp information posted At gate.
08/21/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Met with GC about concrete washout not on site. He assured me he would have a wash out before pouring concrete.
08/06/2019 SITE - Stormwater Follow-up RLEDONNE Continued Entered by DMERANZ1 - Storm water controls in place. Stormwater information sign still not up at the entrance. Talk to general contractor he said it would be up by the end of the week.