Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP18-0257
Permit Details
Apply Date:
10/17/2018
Applicant:
Brandy Burke
Description:
E SITE/GRADING/SWPPP - Mister Car Wash at the Bridges
Permit Reviews
Permit Number - DP18-0257
Permit Status: Complete
Permit Description: E SITE/GRADING/SWPPP - Mister Car Wash at the Bridges
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/25/2019 | DEV PKG - RESUBMITTAL | 02/28/2019 | COMPLETED |
03/11/2019 | DEV PKG - RESUBMITTAL | 03/11/2019 | COMPLETED |
09/19/2018 | DEV PKG - OK TO SUBMIT | 10/17/2018 | COMPLETED |
10/22/2018 | DEV PKG | 12/03/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP18-0257
Permit Description: E SITE/GRADING/SWPPP - Mister Car Wash at the Bridges
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
10/01/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 04/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - Post all of your SWPPP documentation. Install the temporary basin at the southeast area as shown. } |
|
10/01/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 10/01/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 04/16/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - Left open for information only. Ryan with MW Morisey. 954-0747 Subcontractor RW strong excavating 631-3944. Stone art masonry 722 Dash3903. Engineer is WLB at 881 Dash7480. Architect Barack the cat 823 Studios 245-4010. } |
|
10/10/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 10/10/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/01/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - There are no issues at this time.} ; {Activity date: 07/11/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - No issues or concerns at this time. } ; {Activity date: 06/10/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - No issues at this time. I reminded the superintendent to call for follow-up inspections biweekly.} ; {Activity date: 04/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - No issues at this time. My only concern is protecting the existing drainage canal to the east of the property. I requested that the contractor call for inspection by weekly and coordinate with his SWPPP inspections. } |
|
10/15/2019 | ENGR Grading Final | Passed | {Activity date: 10/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/01/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor still needs to excavate at riprap and curb opening areas. Pony walls and water harvesting and the accessible route from Campbell still have yet to be completed.} ; {Activity date: 09/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure slab is OK. Contractor is performing final grading and installing underground utilities.} ; {Activity date: 09/03/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I spoke with Ryan from MW Morrissey. And Strunk excavating about ensuring that elevation of the overflow at the basin is Installed as shown Reschedule for trash closure slab} ; {Activity date: 07/11/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Install verticals and complete Bond Beam for trash enclosure.} ; {Activity date: 06/18/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Trash enclosure footing.} ; {Activity date: 06/10/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by CBELL1 - 18 inch HDPE as shown on plan OK to cover.} ; {Activity date: 04/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CMURPHY1 - Use this inspection for your below ground drainage piping, grading and walkway installations and your trash enclosure installations. Note trash enclosure shall be installed for city of Tucson detail six–01. With rebar at 32 inches OC vertical. See plans for additional specifications.} |
|
10/17/2019 | COT - FCON - Fire - Final | Passed | {Activity date: 10/17/2019; Status: Approved; Inspector: JPEELDAVIS; Comment: Entered by JPEELDA1 - FIRE FINAL NOT REQUIRED ON A DP} | |
10/17/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 10/17/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/15/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
10/24/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 10/24/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/17/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete landscaping, riprap and ground stabilization Provide notice of termination for the SWPPP from the state.} ; {Activity date: 10/01/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide NOT once the work has been completed.} |
|
11/05/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 11/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Depress water harvesting areas 6 inches. Install rip rap that head of drainage canal. Provide splash blocks the canopy drains. Insured properly sized trees were installed. Clean spilled over dirt from concrete panel. Install bicycle parking.} ; {Activity date: 10/17/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete landscaping, riprap and ground stabilization Provide notice of termination for the SWPPP from the state.} ; {Activity date: 10/15/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Double stakes all trees removed nursery stakes } |
|
11/05/2019 | ENGR Engineering Final | Passed | {Activity date: 11/05/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Depress water harvesting areas 6 inches. Install rip rap that head of drainage canal. Provide splash blocks the canopy drains. Insured properly sized trees were installed. Clean spilled over dirt from concrete panel. Install bicycle parking.} ; {Activity date: 10/17/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - for temporary certificate of occupancy.} ; {Activity date: 10/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Stabilize all exposed disturbed dirt.} ; {Activity date: 10/01/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I told Ryan with MW Morrissey that a letter certifying final grade would be required for this project.} |