Permit: DP18-0257

Parcel: 13213101A


Addresses:

2975 S KINO PW

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
10/01/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Approved Entered by DMERANZ1 -
04/16/2019 PDSD Engineering Division Pre-Construction SITE BBENEDON Partial Approval Entered by CMURPHY1 - Left open for information only. Ryan with MW Morisey. 954-0747 Subcontractor RW strong excavating 631-3944. Stone art masonry 722 Dash3903. Engineer is WLB at 881 Dash7480. Architect Barack the cat 823 Studios 245-4010.