Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/16/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CMURPHY1 - |
| 09/04/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - Trash enclosure slab. |
| 09/03/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - I spoke with Ryan from MW Morrissey. And Strunk excavating about ensuring that elevation of the overflow at the basin is Installed as shown
Reschedule for trash closure slab |
| 08/19/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Pre-grout for trash enclosure |
| 07/11/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Install verticals and complete Bond Beam for trash enclosure. |
| 06/18/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Trash enclosure footing. |
| 10/01/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/15/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/01/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor still needs to excavate at riprap and curb opening areas. Pony walls and water harvesting and the accessible route from Campbell still have yet to be completed. |
| 09/04/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Trash enclosure slab is OK. Contractor is performing final grading and installing underground utilities. |
| 09/03/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - I spoke with Ryan from MW Morrissey. And Strunk excavating about ensuring that elevation of the overflow at the basin is Installed as shown
Reschedule for trash closure slab |
| 07/11/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Install verticals and complete Bond Beam for trash enclosure. |
| 06/18/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Trash enclosure footing. |
| 06/10/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by CBELL1 - 18 inch HDPE as shown on plan OK to cover. |
| 04/16/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by CMURPHY1 - Use this inspection for your below ground drainage piping, grading and walkway installations and your trash enclosure installations. Note trash enclosure shall be installed for city of Tucson detail six-01. With rebar at 32 inches OC vertical. See plans for additional specifications. |