Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 10/10/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/01/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - There are no issues at this time. |
| 07/11/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by DMERANZ1 - No issues or concerns at this time.
|
| 06/10/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CBELL1 - No issues at this time. I reminded the superintendent to call for follow-up inspections biweekly. |
| 04/16/2019 |
SITE - Stormwater Follow-up
|
BBENEDON |
Continued |
Entered by CMURPHY1 - No issues at this time. My only concern is protecting the existing drainage canal to the east of the property. I requested that the contractor call for inspection by weekly and coordinate with his SWPPP inspections.
|