Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/05/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/24/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Depress water harvesting areas 6 inches. Install rip rap that head of drainage canal. Provide splash blocks the canopy drains. Insured properly sized trees were installed. Clean spilled over dirt from concrete panel. Install bicycle parking. |
| 10/17/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - for temporary certificate of occupancy. |
| 10/11/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Final grade is acceptable OK to install landscaping. |
| 11/05/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/24/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Depress water harvesting areas 6 inches. Install rip rap that head of drainage canal. Provide splash blocks the canopy drains. Insured properly sized trees were installed. Clean spilled over dirt from concrete panel. Install bicycle parking. |
| 10/17/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - for temporary certificate of occupancy. |
| 10/15/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Stabilize all exposed disturbed dirt. |
| 10/01/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - I told Ryan with MW Morrissey that a letter certifying final grade would be required for this project. |