Permit Reviews
Permit Number - DP17-0154
Permit Status: Complete
Permit Description: SITE/GRADE - POPEYES RESTAURANT
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/04/2019 | REVISION - - 2ND | 02/04/2019 | COMPLETED |
| 02/20/2019 | REVISION - - 2ND | 03/05/2019 | COMPLETED |
| 03/06/2018 | RESUB - SITE and/or GRADING | 04/06/2018 | COMPLETED |
| 04/06/2018 | RESUB - SITE/GRADING ALL | 11/08/2018 | COMPLETED |
| 06/27/2017 | DEV PKG - OK TO SUBMIT | 06/27/2017 | COMPLETED |
| 06/27/2017 | SITE and/or GRADING | 09/25/2017 | COMPLETED |
| 09/25/2017 | RESUB - SITE and/or GRADING | 03/06/2018 | COMPLETED |
| 11/08/2018 | REVISION - - 1ST | 11/08/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP17-0154
Permit Description: SITE/GRADE - POPEYES RESTAURANT
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2019 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/30/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 01/22/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by VFLORES1 - There are no controls in place , however no swipe p is required .} | |
| 05/15/2019 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 05/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 05/15/2019 | SITE - Stormwater Follow-up | Passed | {Activity date: 05/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } ; {Activity date: 04/04/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is some traffic out into the alley, but nine onto Speedway at this time.} ; {Activity date: 03/26/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There is no track out onto Speedway as the gate is closed. There is some track out into the alley. No concerns at this time.} ; {Activity date: 03/12/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues or concerns at this time} ; {Activity date: 02/19/2019; Status: Continued; Inspector: bbenedo1; Comment: Entered by BBENEDO1 - Minor track out onto the sidewalk on stone. Protection in place. No other issues.} ; {Activity date: 02/06/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - The site is closed due to a rain event, there are no concerns or issues at this time.} ; {Activity date: 02/05/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - There are no issues at this time.} ; {Activity date: 01/30/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by CBELL1 - Controls are in place as needed.} ; {Activity date: 01/22/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by VFLORES1 - There is notable track out onto Stone Avenue . Aaron with Boyd Excavating said he will take care of it .} |
|
| 05/15/2019 | SITE - Stormwater Final Inspection | Passed | {Activity date: 05/15/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by CBELL1 - } | |
| 05/16/2019 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/22/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VFLORES1 - Rick with McManus construction 269 - 9783 and Erin Boyd with Boyd Excavating. No swipp required however contractor is required to clean up any track out onto public streets as needed. Inspector suggest controls to help mitigate track out. Call for inspections of your trash enclosure when you are ready and please call in for inspections of stormwater control periodically.} | |
| 05/16/2019 | COT - ENGR - Signage Final | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } | |
| 05/21/2019 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 05/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking.} ; {Activity date: 05/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance.} ; {Activity date: 05/15/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by CBELL1 - Landscaper needs to remove small shrubs in water harvesting areas on the south side of the building and lower the grade to the six -9Inches specified on the plans. Stake trees for the detail} | |
| 05/21/2019 | ENGR Engineering Final | Passed | {Activity date: 05/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking.} ; {Activity date: 05/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance.} ; {Activity date: 05/15/2019; Status: Denied; Inspector: BBENEDON; Comment: Entered by CBELL1 - Harvesting areas on the south side of the site need to be dug down substantially.} ; {Activity date: 05/14/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I walk the site with Pete and we discussed which areas still need to come down. Plan calls for 6-9 She has depression in landscaped areas.} | |
| 05/21/2019 | ENGR Grading Final | Passed | {Activity date: 05/21/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking.} |