Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 05/16/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 05/15/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Contractor is currently installing landscaping at this time. |
| 05/14/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Detail shows staking |
| 05/21/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Approved |
Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking. |
| 05/16/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance. |
| 05/15/2019 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - Landscaper needs to remove small shrubs in water harvesting areas on the south side of the building and lower the grade to the six -9Inches specified on the plans. Stake trees for the detail |