Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/16/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 01/22/2019 |
PDSD Engineering Division Pre-Construction SITE |
BBENEDON |
Partial Approval |
Entered by VFLORES1 - Rick with McManus construction 269 - 9783 and Erin Boyd with Boyd Excavating. No swipp required however contractor is required to clean up any track out onto public streets as needed. Inspector suggest controls to help mitigate track out. Call for inspections of your trash enclosure when you are ready and please call in for inspections of stormwater control periodically. |