Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/30/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 02/28/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - Trash enclosure is ready for grout |
| 02/07/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by CBELL1 - Trash enclosure footings and bollards per city detail six Dash 01.
|
| 02/06/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by CBELL1 - There is no access to the site due to rain. |
| 02/05/2019 |
ENGR Grading Final |
BBENEDON |
Denied |
Entered by CBELL1 - Double trashing closure requires number four vertical rebar at 32 inches on center, also provide 6 inches of clearance below bollards with minimum 36 inches below finished floor. See city of Tucson standard detail 6-01.1 |
| 05/15/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by CBELL1 - |
| 04/04/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor is installing curbs and preparing Drive through. |
| 03/26/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor is installing curbs and has begun right of way work on speedway. |
| 01/30/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by CBELL1 - Contractor is installing building pad. |
| 05/21/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking. |