Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking. |
| 05/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Contractor still finishing |
| 05/16/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance. |
| 05/15/2019 |
ENGR Engineering Final
|
BBENEDON |
Continued |
Entered by CBELL1 - engineering has no issues preventing a TCo |
| 05/14/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Engineering has no issues that would prevent TCO. |
| 05/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking. |
| 05/16/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance. |
| 05/15/2019 |
ENGR Engineering Final
|
BBENEDON |
Denied |
Entered by CBELL1 - Harvesting areas on the south side of the site need to be dug down substantially. |
| 05/14/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - I walk the site with Pete and we discussed which areas still need to come down. Plan calls for 6-9 She has depression in landscaped areas. |