Permit: DP17-0154

Parcel: 11508100C


Addresses:

1110 N STONE AV

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
05/21/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking.
05/21/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor still finishing
05/16/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance.
05/15/2019 ENGR Engineering Final BBENEDON Continued Entered by CBELL1 - engineering has no issues preventing a TCo
05/14/2019 ENGR Engineering Final BBENEDON Partial Approval Entered by DMERANZ1 - Engineering has no issues that would prevent TCO.
05/21/2019 ENGR Engineering Final BBENEDON Approved Entered by DMERANZ1 - Provide galvanized tie wire and braided hose at tree staking.
05/16/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Complete the landscaping, stake the trees, complete the riprap, install the ground cover as shown. Complete the work in the right of way, sidewalk at the south entrance.
05/15/2019 ENGR Engineering Final BBENEDON Denied Entered by CBELL1 - Harvesting areas on the south side of the site need to be dug down substantially.
05/14/2019 ENGR Engineering Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - I walk the site with Pete and we discussed which areas still need to come down. Plan calls for 6-9 She has depression in landscaped areas.