Permit Details

Status:
Complete
Type:
Development Package
Address:
485 S STONE AV
Address NEW:
485 S STONE AV
Apply Date:
12/29/2016
Applicant:
Brandy Burke
Description:
SITE/GRADING - Downtown Clifton Motel expansion.

Permit Reviews

Permit Number - DP16-0238
Permit Status: Complete
Permit Description: SITE/GRADING - Downtown Clifton Motel expansion.
Start Date Submittal Complete Date Status  
04/20/2017 DEV PKG - RESUBMITTAL 05/16/2017 COMPLETED Review Details
05/16/2017 DEV PKG - RESUBMITTAL 09/28/2018 COMPLETED Review Details
09/24/2019 DEV PKG - OK TO SUBMIT 10/25/2019 COMPLETED Review Details
10/25/2019 REVISION - - 2ND 12/04/2019 COMPLETED Review Details
11/13/2018 DEV PKG - REVISION 11/16/2018 COMPLETED Review Details
12/29/2016 DEV PKG - OK TO SUBMIT 12/29/2016 COMPLETED Review Details
12/29/2016 DEV PKG 04/20/2017 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP16-0238
Permit Description: SITE/GRADING - Downtown Clifton Motel expansion.
Total Completed Inspections - 10
Date Description Inspector Results Comments
10/01/2018 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/01/2018; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DISCUSSED WHAT WILL BE NEEDED FOR THIS SITE ONCE IT GETS UNDERWAY NEXT WEEK. FIRST THEY WILL BE WORKING ON THE REMOVAL OF THE EXISTING STEM WALLS FROM AROUND THE SITE AND THEN PROCEED TO BUILD ALL OF THE PADS FOR THE BUILDINGS(4). I HAVE ASKED THAT THEY SCHEDULE THIS SITE FOR INSPECTIONS EVRY TWO WEEKS DURING THE DEMO AND THE MATERIAL IMPORT FOR THE BUILDING OF THE PADS, AFTER THAT THEY CAN SCHEDULE THIS SITE FOR A ONCE A MONTH INSPECTION OR AS NEEDED ON A REGULAR BASIS. ALSO THE CONTRACTOR WILL BE PLACING WADDLE MATERIAL AROUND THE SITE TO ENSURE THAT THERE ARE NO ISSUES WITH THE STORMWATER FOR THIS SITE.}
10/07/2019 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/07/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
10/07/2019 SITE - Stormwater Follow-up Passed {Activity date: 10/07/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/16/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - I met with Mike on site and reminded him to keep the sidewalk and street clear of construction materials and dirt. And to schedule storm water inspections by weekly.} ; {Activity date: 08/15/2019; Status: Continued; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - sidewalk along stone av is blocked with no signage. A right of way permit is required, or keep sidewalk clear of temp fencing and rocks.
Trackout Controls are needed at the east entrance to the site.}
10/07/2019 SITE - Stormwater Setup and Controls Passed {Activity date: 10/07/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
10/07/2019 COT - ENGR - Signage Final Passed {Activity date: 10/07/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 09/24/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor has started excavation for trash enclosure pad and on-site walkways.}
10/09/2019 SITE - Stormwater Final Inspection Passed {Activity date: 10/09/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/07/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
11/18/2019 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 11/18/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes.} ; {Activity date: 10/07/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Complete all landscaping for approved plans.} ; {Activity date: 08/16/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Landscaping to be installed within the right way to be inspected by transportation}
11/18/2019 ENGR Grading Final Passed {Activity date: 11/18/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - } ; {Activity date: 10/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes.} ; {Activity date: 10/07/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
12/12/2019 SITE - Zoning Final Passed {Activity date: 12/12/2019; Status: Approved; Inspector: RSALDAT1; Comment: Entered by RSALDAT1 - Inspection of exterior of abutting historic structure, located on the most northern side of the property and is addressed as 475 S. Stone. Inspection was conducted Post construction of the permitted building and a walk around the perimeter of historic structure found no signs of movement. Report generated and meeting with associated Planners found that the Zoning Final met all criteria, will close this Zoning Final as compliance.} ; {Activity date: 12/05/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Contractor could show no documentation confirming vibration study.} ; {Activity date: 11/18/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Comply with the previously noted requirements. Provide a copy of the city approved revised plan. Complete all work shown. Correct cross slopes where required.} ; {Activity date: 10/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Complete vibration study and demo permit.} ; {Activity date: 10/07/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - }
12/20/2019 ENGR Engineering Final Passed {Activity date: 12/20/2019; Status: Approved; Inspector: BBENEDON; Comment: Entered by PMARTIN1 - } ; {Activity date: 12/05/2019; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Pending approval of zoning requirements; vibration study} ; {Activity date: 11/18/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Comply with the previously noted requirements. Provide a copy of the city approved revised plan. Complete all work shown. Correct cross slopes where required.} ; {Activity date: 10/09/2019; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes.}

Documents

File Name Document Type  
REV-2_01-18031_LAND SHEETS DELTA 2.PDF DOCUMENTS VIEW
DP16-0238 L OF C.PDF LETTER OF COMPLETION VIEW
001_COVER SHEET_1 OF 15.TIF DEVELOPMENT PACKAGE VIEW
002_NOTES_2 OF 15.TIF DEVELOPMENT PACKAGE VIEW
003_SITE PLAN_3 OF 15.TIF DEVELOPMENT PACKAGE VIEW
004_GRADING / DRAINAGE_4 OF 15.TIF DEVELOPMENT PACKAGE VIEW
005_UTILITIES / EASEMENTS_5 OF 15.TIF DEVELOPMENT PACKAGE VIEW
006_DETAILS_6 OF 15.TIF DEVELOPMENT PACKAGE VIEW
007_DEMOLITION PLAN_7 OF 15.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE PLAN_8 OF 15.TIF DEVELOPMENT PACKAGE VIEW
009_IRRIGATION PLAN_9 OF 15.TIF DEVELOPMENT PACKAGE VIEW
010_LANDSCAPE DETAILS_10 OF 15.TIF DEVELOPMENT PACKAGE VIEW
011_IRRIGATION DETAILS_11 OF 15.TIF DEVELOPMENT PACKAGE VIEW
012_SPECIFICATIONS_12 OF 15.TIF DEVELOPMENT PACKAGE VIEW
013_SPECIFICATIONS_13 OF 15.TIF DEVELOPMENT PACKAGE VIEW
014_SPECIFICATIONS_14 OF 15.TIF DEVELOPMENT PACKAGE VIEW
015_SPECIFICATIONS_15 OF 15.TIF DEVELOPMENT PACKAGE VIEW
011_SHEET 15A OF 15.TIF DEVELOPMENT PACKAGE VIEW
012_SHEET 15B OF 15.TIF DEVELOPMENT PACKAGE VIEW
013_SHEET 15C OF 15.TIF DEVELOPMENT PACKAGE VIEW
AVIGATION EASEMENT - TUS.PDF DOCUMENTS VIEW
FACILITIES MAP.PDF DOCUMENTS VIEW
1A_DP16-0238_DP_ADDRESSING.PDF DOCUMENTS VIEW
ADDRESSING COMMENT SUMMARY DP16-0238.PDF DOCUMENTS VIEW
DOWNTOWN CLIFTON HYDRO STATEMENT.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
DESIGN REVIEW - CLIFTON HOTEL DP REVISIONS 11 18 19.PDF DOCUMENTS VIEW
REVISION LETTER SITE CHANGES.PDF DOCUMENTS VIEW