Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 12/05/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 11/18/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Comply with the previously noted requirements. Provide a copy of the city approved revised plan. Complete all work shown. Correct cross slopes where required. |
| 10/21/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - I spoke with Kevin Hall regarding water harvesting Areas, and the change made at the entry path to the public building and also dumpster enclosure.
I told him I would except a letter for the changes made. He told me that water harvesting areas were not required for this project. |
| 10/09/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes. |
| 10/07/2019 |
ENGR Engineering Final
|
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete all other activities before calling for final. |
| 12/20/2019 |
ENGR Engineering Final
|
BBENEDON |
Approved |
Entered by PMARTIN1 - |
| 12/05/2019 |
ENGR Engineering Final
|
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Pending approval of zoning requirements; vibration study |
| 11/18/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Comply with the previously noted requirements. Provide a copy of the city approved revised plan. Complete all work shown. Correct cross slopes where required. |
| 10/09/2019 |
ENGR Engineering Final
|
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes. |