Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: DP16-0238

Parcel: 11714214A


Addresses:

485 S STONE AV

Inspection Status: Passed

Inspection History: PDSD Site/Engineering Division - Landscaping

Date Description Inspector Results Comments
11/18/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Approved Entered by DMERANZ1 -
10/09/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Not ready for Inspection Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall. Provide documentation for all changes.
09/24/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor has started excavation for trash enclosure pad and on-site walkways.
11/18/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Approved Entered by DMERANZ1 -
10/09/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Not ready for Inspection Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall. Provide documentation for all changes.
10/07/2019 PDSD Site/Engineering Division - Landscaping RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete all landscaping for approved plans.
08/16/2019 PDSD Site/Engineering Division - Landscaping BBENEDON Not ready for Inspection Entered by DMERANZ1 - Landscaping to be installed within the right way to be inspected by transportation