Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/09/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/07/2019 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - |
| 10/09/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/07/2019 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - Complete rebar for Matt in trash enclosure and set on Dobie blocks |
| 09/24/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Contractor has started excavation for trash enclosure pad and on-site walkways. |
| 09/03/2019 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by DMERANZ1 - Trash enclosure footing. |
| 08/30/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - GC will reschedule for the following business day, for trash enclosure footings. |
| 11/18/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/09/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes. |
| 10/02/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Trash enclosure bollards have been installed. Provide rebar mat for slab inspection. Provide curb access ramp as shown |
| 09/24/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Contractor has started excavation for trash enclosure pad and on-site walkways. |
| 09/20/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VFLORES1 - Met with contractor with regards to parking requirements and building certificates of occupancy’s. |
| 08/16/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Mike was curious why his plans specify below grade water retention. I suggested that he ask his engineers |
| 08/15/2019 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by DMERANZ1 - Contractor is installing site utilities and interior walk ways
Mike w me morrisey is not on site 935 through 9:55 AM. Phone message. 954-1248 |
| 08/14/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Mike at 954-1248 was not on site. He had no specific inspections for today, he simply has some questions and requested inspection for tomorrow morning if possible. |
| 11/18/2019 |
ENGR Grading Final |
BBENEDON |
Approved |
Entered by DMERANZ1 - |
| 10/09/2019 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall.
Provide documentation for all changes. |
| 10/07/2019 |
ENGR Grading Final |
RLEDONNE |
Not ready for Inspection |
Entered by DMERANZ1 - |