Permit: DP16-0238

Parcel: 11714214A


Addresses:

485 S STONE AV

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
10/09/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/07/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 -
10/09/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/07/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 - Complete rebar for Matt in trash enclosure and set on Dobie blocks
09/24/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor has started excavation for trash enclosure pad and on-site walkways.
09/03/2019 ENGR Grading Final BBENEDON Partial Approval Entered by DMERANZ1 - Trash enclosure footing.
08/30/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - GC will reschedule for the following business day, for trash enclosure footings.
11/18/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/09/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall. Provide documentation for all changes.
10/02/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Trash enclosure bollards have been installed. Provide rebar mat for slab inspection. Provide curb access ramp as shown
09/24/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Contractor has started excavation for trash enclosure pad and on-site walkways.
09/20/2019 ENGR Grading Final BBENEDON Continued Entered by VFLORES1 - Met with contractor with regards to parking requirements and building certificates of occupancy’s.
08/16/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Mike was curious why his plans specify below grade water retention. I suggested that he ask his engineers
08/15/2019 ENGR Grading Final BBENEDON Continued Entered by DMERANZ1 - Contractor is installing site utilities and interior walk ways Mike w me morrisey is not on site 935 through 9:55 AM. Phone message. 954-1248
08/14/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Mike at 954-1248 was not on site. He had no specific inspections for today, he simply has some questions and requested inspection for tomorrow morning if possible.
11/18/2019 ENGR Grading Final BBENEDON Approved Entered by DMERANZ1 -
10/09/2019 ENGR Grading Final BBENEDON Not ready for Inspection Entered by DMERANZ1 - Matt and Aparna with MW Morrissey. Provide 6 inch recessed landscaped areas as shown per note number three on your grading plan . Depress landscaping areas 6 inches below curb opening at driveway location. Complete landscaping, stabilization and tree staking. Provide a revision for the deletion of below ground water harvesting. Complete stabilized accessible path, also striping between buildings (cross slope exceeds 2%), We will check for slope after it has been completed. Correct accessible signage, install per detail and in the center of the stall. Provide documentation for all changes.
10/07/2019 ENGR Grading Final RLEDONNE Not ready for Inspection Entered by DMERANZ1 -