Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2018 |
PDSD Engineering Division Pre-Construction SITE |
DROBERTS |
Approved |
Entered by DROBERT5 - MET WITH THE CONTRACTOR AND DISCUSSED WHAT WILL BE NEEDED FOR THIS SITE ONCE IT GETS UNDERWAY NEXT WEEK. FIRST THEY WILL BE WORKING ON THE REMOVAL OF THE EXISTING STEM WALLS FROM AROUND THE SITE AND THEN PROCEED TO BUILD ALL OF THE PADS FOR THE BUILDINGS(4). I HAVE ASKED THAT THEY SCHEDULE THIS SITE FOR INSPECTIONS EVRY TWO WEEKS DURING THE DEMO AND THE MATERIAL IMPORT FOR THE BUILDING OF THE PADS, AFTER THAT THEY CAN SCHEDULE THIS SITE FOR A ONCE A MONTH INSPECTION OR AS NEEDED ON A REGULAR BASIS. ALSO THE CONTRACTOR WILL BE PLACING WADDLE MATERIAL AROUND THE SITE TO ENSURE THAT THERE ARE NO ISSUES WITH THE STORMWATER FOR THIS SITE. |