Permit Details

Status:
Complete
Type:
Development Package
Address:
9955 E 22ND ST
Apply Date:
10/08/2015
Applicant:
Description:
TENTATIVE PLAT/FLD - RED COLT RANCH LOTS 1-21

Permit Reviews

Permit Number - DP15-0174
Permit Status: Complete
Permit Description: TENTATIVE PLAT/FLD - RED COLT RANCH LOTS 1-21
Start Date Submittal Complete Date Status  
02/03/2016 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 02/10/2016 ACTIVE Review Details
10/08/2015 DEV PKG - OK TO SUBMIT 10/08/2015 COMPLETED Review Details
10/08/2015 TENTATIVE PLAT REVIEW 11/13/2015 COMPLETED Review Details
12/15/2015 RESUBMITTAL - CDRC - TENTATIVE PLAT REVIEW 01/25/2016 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP15-0174
Permit Description: TENTATIVE PLAT/FLD - RED COLT RANCH LOTS 1-21
Total Completed Inspections - 7
Date Description Inspector Results Comments
03/24/2016 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 03/24/2016; Status: Approved; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - } ; {Activity date: 03/02/2016; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ON SITE WITH ROB BRACK WITH AF STERLING, MR. TREE, AND MEMBERS OF DESERT EARTH TO DISCUSS WHAT IS NEEDED BEFORE THEY WILL BE ABLE TO START WORK ON THIS SITE. THEY HAVE BEEN ADVISED TO CALL IN THE PRE-CONSTRUCTION MEETING WITH MIKE RUSSO AND HE WILL GO OVER THE SWPPP REQUIREMENTS FOR THIS SITE. ALSO THEY WILL NEED TO MAKE SURE THAT THE PLANTS ARE TAGGED ACCORDING TO THE APPROVED NPPO PLAN FOR THIS SITE. THEY WILL CALL IN THE INSPECTION FOR TOMORROW AND WILL CONTACT THE LANDSCAPE ARCHITECT ABOUT GETTING THE PLANTS TAGGED FOR REMOVAL, TRANSPLANTING ON SITE, OR PRESERVED IN PLACE.} ; {Activity date: 03/04/2016; Status: Continued; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND ADD SUPLEMENTAL CONTROLS ALONG THE NW SIDE OF THE SITE PER THE PRECON INSPECTION FINDINGS
2) CALL FOR INSPECTION WHEN NPPO HAS BEEN IMPLEMENTED AND STORM WATER CONTROLS HAVE BEEN INSTALLED.
3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE
4) POST A SIGNED COPY OF YOUR NOI ON SITE
5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
6) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP
7) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY AS NEEDED}
03/24/2017 SITE - Stormwater Setup and Controls Passed {Activity date: 03/24/2017; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/24/2016; Status: Partial Approval; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
2) POST A SIGNED COPY OF YOUR NOI ON SITE
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PERMIT
4) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY AS NEEDED
5) INSTALL A CONCERETE/MATERIALS WASH OUT WHEN APPLICABLE}
07/26/2017 SITE - Stormwater Follow-up Passed {Activity date: 07/26/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/24/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE NOT BUILT OUT YET, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/14/2016; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CONTRACTOR WORKING ON 3 SFR'S AT THIS TIME.} ; {Activity date: 06/08/2016; Status: Correction Required; Inspector: MRUSSO1; Comment: Entered by MRUSSO1 - 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST PERIMETER.
2) POST A SIGNED COPY OF YOUR NOI AT THE SITE
3) PROVIDE REQUIRED STORM WATER SELF INSPECTIONS ON SITE
4) PROVIDE A CONCRETE/MATERIALS WASH OUT

CALL FOR RE-INSPECTION WHEN CORRECTIONS ARE MADE}
07/26/2017 ENGR Grading Final Passed {Activity date: 07/26/2017; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/24/2017; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - INFRUSTRUCTURE AND SIDE WALKS COMPLETED, SOME LOTS COMPLETED. CALL FOR FINAL INSPECTION WHEN SITE IS STABILIZED}
10/23/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/14/2017; Status: Correction Required; Inspector: DROBERT5; Comment: Entered by DROBERT5 - MET WITH ROB AND THE LANDSCAPER TO LOOK OVER THE SITE AND SEE WHAT WAS NEEDED PRIOR TO A FINAL APPROVAL OF THIS SITE. 1) DUE TO THE RECENT RAINS THE CONTRACTOR WILL NEED TO REMOVE ALL OF THE EXCESS MATERIAL FROM THE STREET AND THEN REPAIR ALL OF THE EROSION ON THE LOTS. THEY WILL BE PLACING ROCK RIP RAP IN THE AREAS WHERE THE SLOPES HAVE ERODED FROM THE RAINS. 2) ALSO THEY WILL BE PLACING ROCK AROUND THE CONCRETE SLAB ON THE EAST SIDE OF THE SITE IN THE COMMON AREA. THIS SLAB IS EAST OF THE DRAINAGE CHANNEL BETWEEN LOTS 8 AND 9 TO PREVENT DIRT FROM ENTERING INTO THE CONCRETE CHANNEL. 3) I NOTICED THAT THE DEVELOPER DID NOT PLACE THE ROCK RIP RAP AT THE BOTTOM OF THE INLET STRUCTURE IN THE BASIN TO PREVENT EROSION. HE WILL MAKE THE DEPRESSED AREA THE SAME WIDTH AS THE CONCRETE, AND THE LENGTH OF IT WILL BE 10. 4) THERE ARE SOME MISSING TREES IN THE COMMON AREA ALONG THE EAST SIDE OF THE SITE. THE EXISTING TREES AND BRUSH IN THIS AREA IS THICK SO THEY MAY NOT BE ABLE TO PLANT ANYTHING AND EXPECT IT TO GROW. ROB WILL GO DOWNTOWN AND TALK TO JOSEPH LINVILLE AND SEE IF THEY CAN ELIMINATE SOME OF THE VEGETATION OR REPLANT IT IN OTHER AREAS. 5) ALONG THE SOUTHSIDE OF THE PROJECT THE DEVELOPER NEEDS TO PLACE SOME HYDROSEED IN AREAS WHERE THE EXISTING VEGETATION HAS BEEN REMOVED. 6) THE LANDSCAPE CONTRACTOR WILL BE REPLACING ANY DAMAGED, DEAD, OR MISSING PLANTS THROUGHOUT THE SITE AS NEEDED.} ; {Activity date: 07/26/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - 1) COMPLETE THE LANDSCAPING AS SHOWN ON THE APPROVED TENTATIVE PLAT, AND ENSURE THAT ALL ARE VIABLE PLANTS AT THE TIME OF THE FINAL INSPECTION. THERE APPEARS TO BE SOME TREES MISSING ADJACENT TO BONANZA STEET.
2) PROVIDE A LETTER FROM THE ENGINEER OF RECORD FOR THE MINOR CHANGES THAT HAVE BEEN MADE TO THE BASIN VERIFYING THAT THE REQUIRED QUANTITIES HAVE NOT BEEN CHANGED.
3) COMPLETE THE CLEANUP OF THE SITE PRIOR TO YOUR OFFICE SCHEDULING THE FINAL GRADING FOR THIS SITE. PROVIDE US WITH A NOTICE OF TERMINATION FOR THE SWPPP THAT IS ACTIVE ON THIS SITE AND PROVIDE US WITH AN APPROVED SET OF REVISED DRAWINGS TO BE UTILIZED DURING THE FINAL INSPECTION OF THIS SITE.}
10/23/2020 ENGR Engineering Final Passed {Activity date: 10/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - APPROVED} ; {Activity date: 08/14/2017; Status: Correction Required; Inspector: DROBERT5; Comment: Entered by DROBERT5 - MET WITH ROB AND THE LANDSCAPER TO LOOK OVER THE SITE AND SEE WHAT WAS NEEDED PRIOR TO A FINAL APPROVAL OF THIS SITE. 1) DUE TO THE RECENT RAINS THE CONTRACTOR WILL NEED TO REMOVE ALL OF THE EXCESS MATERIAL FROM THE STREET AND THEN REPAIR ALL OF THE EROSION ON THE LOTS. THEY WILL BE PLACING ROCK RIP RAP IN THE AREAS WHERE THE SLOPES HAVE ERODED FROM THE RAINS. 2) ALSO THEY WILL BE PLACING ROCK AROUND THE CONCRETE SLAB ON THE EAST SIDE OF THE SITE IN THE COMMON AREA. THIS SLAB IS EAST OF THE DRAINAGE CHANNEL BETWEEN LOTS 8 AND 9 TO PREVENT DIRT FROM ENTERING INTO THE CONCRETE CHANNEL. 3) I NOTICED THAT THE DEVELOPER DID NOT PLACE THE ROCK RIP RAP AT THE BOTTOM OF THE INLET STRUCTURE IN THE BASIN TO PREVENT EROSION. HE WILL MAKE THE DEPRESSED AREA THE SAME WIDTH AS THE CONCRETE, AND THE LENGTH OF IT WILL BE 10. 4) THERE ARE SOME MISSING TREES IN THE COMMON AREA ALONG THE EAST SIDE OF THE SITE. THE EXISTING TREES AND BRUSH IN THIS AREA IS THICK SO THEY MAY NOT BE ABLE TO PLANT ANYTHING AND EXPECT IT TO GROW. ROB WILL GO DOWNTOWN AND TALK TO JOSEPH LINVILLE AND SEE IF THEY CAN ELIMINATE SOME OF THE VEGETATION OR REPLANT IT IN OTHER AREAS. 5) ALONG THE SOUTHSIDE OF THE PROJECT THE DEVELOPER NEEDS TO PLACE SOME HYDROSEED IN AREAS WHERE THE EXISTING VEGETATION HAS BEEN REMOVED. 6) THE LANDSCAPE CONTRACTOR WILL BE REPLACING ANY DAMAGED, DEAD, OR MISSING PLANTS THROUGHOUT THE SITE AS NEEDED.}
10/23/2020 SITE - Stormwater Final Inspection Passed {Activity date: 10/23/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 08/14/2017; Status: Correction Required; Inspector: DROBERT5; Comment: Entered by DROBERT5 - COMPLETE ALL WORKED NOTED IN THE FINAL GRADING INSPECTION, AND REMOVE ALL REMAINING STORMWATER MATERIALS. PROVIDE US WITH THE NOTICE OF TERMINATION FROM ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY AND A CERTIFICATION LETTER FROM THE ENGINEER OF RECORD FOR THIS SITE PRIOR TO US FINALING OUT THE REMAINING INSPECTIONS.} ; {Activity date: 07/26/2017; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - COMPLETE REMOVAL OF THE CONTROLS AND PROVIDE US WITH THE NOTICE OF TERMINATION FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY, AND ANY REVISED APPROVED DRAWINGS.}

Documents

File Name Document Type  
001_COVER SHEET / GENERAL NOTES_1 OF 9.TIF DEVELOPMENT PACKAGE VIEW
002_TENTATIVE PLAT / SECTIONS_2 OF 9.TIF DEVELOPMENT PACKAGE VIEW
003_LANDSCAPE COVER SHEET_3 OF 9.TIF DEVELOPMENT PACKAGE VIEW
004_PRESERVATION_4 OF 9.TIF DEVELOPMENT PACKAGE VIEW
005_PRESERVATION CALCULATIONS_5 OF 9.TIF DEVELOPMENT PACKAGE VIEW
006_LANDSCAPE_6 OF 9.TIF DEVELOPMENT PACKAGE VIEW
007_IRRIGATION_7 OF 9.TIF DEVELOPMENT PACKAGE VIEW
008_LANDSCAPE DETAILS_8 OF 9.TIF DEVELOPMENT PACKAGE VIEW
009_ARCHITECTURAL VARIATION_9 OF 9.TIF DEVELOPMENT PACKAGE VIEW
WATER COMMENTS - RED COLT RANCH SUBDIVISION.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
PAG_FLD CALC.PDF DOCUMENTS VIEW
PAG_FLD.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
SWG TUCSON DISTRICT CONTACT INFO-MAP-STANDBY.PDF DOCUMENTS VIEW
SWG COMMENTS - RED COLT RANCH FLD.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
ARCHITECTURAL VARIATION PLAN.PDF DOCUMENTS VIEW