Inspection Status: Passed
Inspection History: ENGR Grading Final
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/24/2017 |
ENGR Grading Final |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - INFRUSTRUCTURE AND SIDE WALKS COMPLETED, SOME LOTS COMPLETED. CALL FOR FINAL INSPECTION WHEN SITE IS STABILIZED |
| 07/26/2017 |
ENGR Grading Final |
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 10/28/2016 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by MRUSSO1 - LOOKED AT DRAINAGE WAY AND RE-BAR FOR RETAINING WALL ALONG DRAINAGE. NO WORK SINCE LAST INSPECTION |
| 10/19/2016 |
ENGR Grading Final |
MRUSSO |
Continued |
Entered by MRUSSO1 - RE-BAR INSTALLED PER PLAN - OK TO POUR |
| 10/14/2016 |
ENGR Grading Final |
MRUSSO |
Not ready for Inspection |
Entered by MRUSSO1 - PROVIDE AND APPROVED PLAN THAT SHOWS CHANGES MADE
COMPLETE INSTALLATION |