Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2017 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 03/24/2016 |
SITE - Stormwater Setup and Controls |
MRUSSO1 |
Partial Approval |
Entered by MRUSSO1 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT
2) POST A SIGNED COPY OF YOUR NOI ON SITE
3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PERMIT
4) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY AS NEEDED
5) INSTALL A CONCERETE/MATERIALS WASH OUT WHEN APPLICABLE |