Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/2017 |
SITE - Stormwater Follow-up
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/24/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - SITE NOT BUILT OUT YET, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 11/14/2016 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CONTRACTOR WORKING ON 3 SFR'S AT THIS TIME. |
| 06/08/2016 |
SITE - Stormwater Follow-up
|
MRUSSO1 |
Correction Required |
Entered by MRUSSO1 - 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST PERIMETER.
2) POST A SIGNED COPY OF YOUR NOI AT THE SITE
3) PROVIDE REQUIRED STORM WATER SELF INSPECTIONS ON SITE
4) PROVIDE A CONCRETE/MATERIALS WASH OUT
CALL FOR RE-INSPECTION WHEN CORRECTIONS ARE MADE |