Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 07/26/2017 |
SITE - Stormwater Follow-up
|
DROBERTS |
Approved |
Entered by DROBERT5 - |
| 03/24/2017 |
SITE - Stormwater Follow-up
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - SITE NOT BUILT OUT YET, NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 11/14/2016 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME, CONTRACTOR WORKING ON 3 SFR'S AT THIS TIME. |
| 06/08/2016 |
SITE - Stormwater Follow-up
|
MRUSSO1 |
Correction Required |
Entered by MRUSSO1 - 1) RE-ESTABLISH SEDIMENT CONTROLS ALONG THE WEST PERIMETER.
2) POST A SIGNED COPY OF YOUR NOI AT THE SITE
3) PROVIDE REQUIRED STORM WATER SELF INSPECTIONS ON SITE
4) PROVIDE A CONCRETE/MATERIALS WASH OUT
CALL FOR RE-INSPECTION WHEN CORRECTIONS ARE MADE |