Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP15-0174
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/24/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO1 | Approved | Entered by MRUSSO1 - |
03/02/2016 | PDSD Engineering Division Pre-Construction SITE | DROBERTS | Not ready for Inspection | Entered by DROBERT5 - MET ON SITE WITH ROB BRACK WITH AF STERLING, MR. TREE, AND MEMBERS OF DESERT EARTH TO DISCUSS WHAT IS NEEDED BEFORE THEY WILL BE ABLE TO START WORK ON THIS SITE. THEY HAVE BEEN ADVISED TO CALL IN THE PRE-CONSTRUCTION MEETING WITH MIKE RUSSO AND HE WILL GO OVER THE SWPPP REQUIREMENTS FOR THIS SITE. ALSO THEY WILL NEED TO MAKE SURE THAT THE PLANTS ARE TAGGED ACCORDING TO THE APPROVED NPPO PLAN FOR THIS SITE. THEY WILL CALL IN THE INSPECTION FOR TOMORROW AND WILL CONTACT THE LANDSCAPE ARCHITECT ABOUT GETTING THE PLANTS TAGGED FOR REMOVAL, TRANSPLANTING ON SITE, OR PRESERVED IN PLACE. |
03/04/2016 | PDSD Engineering Division Pre-Construction SITE | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP AND ADD SUPLEMENTAL CONTROLS ALONG THE NW SIDE OF THE SITE PER THE PRECON INSPECTION FINDINGS 2) CALL FOR INSPECTION WHEN NPPO HAS BEEN IMPLEMENTED AND STORM WATER CONTROLS HAVE BEEN INSTALLED. 3) INSTALL A STABILIZED CONSTRUCTION ENTRANCE 4) POST A SIGNED COPY OF YOUR NOI ON SITE 5) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE 6) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR SWPPP 7) SWEEP UP TRACKED SOIL OFF ADJACENT ROADWAY AS NEEDED |