Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP15-0102
Permit Details
Status:
Issued
Type:
Development Package
Address:
10495 S MILLICENT TR
Address NEW:
10495 S MILLICENT TR
Apply Date:
07/07/2015
Applicant:
David Young
Description:
Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
Permit Reviews
Permit Number - DP15-0102
Permit Status: Issued
Permit Description: Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/18/2022 | REVISION - - 1ST | 04/15/2022 | COMPLETED |
| 04/22/2022 | REVISION - - 1ST | 04/25/2022 | ACTIVE |
| 06/28/2021 | DEV PKG - OK TO SUBMIT | 07/08/2021 | COMPLETED |
| 07/07/2015 | DEV PKG - OK TO SUBMIT | 07/07/2015 | COMPLETED |
| 07/07/2015 | SITE and/or GRADING | 11/20/2015 | COMPLETED |
| 07/08/2021 | REVISION - - 1ST | 09/01/2021 | COMPLETED |
| 09/20/2021 | REVISION - - 1ST | 10/21/2021 | COMPLETED |
| 11/20/2015 | RESUB - SITE/GRADING ALL | 12/22/2015 | COMPLETED |
| 12/06/2021 | REVISION - - 1ST | 12/15/2021 | COMPLETED |
| 12/22/2015 | RESUB - SITE and/or GRADING | 06/24/2019 | COMPLETED |
| 09/16/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/24/2024 | REQUIRES RESUBMIT |
| 09/24/2024 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 10/23/2024 | APPROVED |
| 01/27/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 02/03/2025 | REQUIRES RESUBMIT |
| 02/20/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 03/28/2025 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP15-0102
Permite Description: Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2021 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 05/26/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - THE VISTAS AT RINCON KNOLLS PHASE 2 LOTS 161-349 AND C.A. iAi-iEi. NEED TO RESCHEDULE FOR TOMORROW .} ; {Activity date: 04/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE .CONVERSATION WITH CLINT HE INFORMED ME THAT THEY CANNOT START .UNTIL THE TURTLE STUDY IS COMPLETED .WILL KEEP THE CITY INFORMED ON THE ON GOING STUDY .} |
| 09/27/2021 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 09/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD TODAY.} ; {Activity date: 05/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } |
| 09/26/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | not ready yet until further more inspections is needed |
| 10/05/2023 | ENGR Grading Final | N/A | Not Ready | Complete all work on this site is showing on the approved plans prior to calling in this inspection again for the final grading |
| 10/31/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Residential construction. No one on site. Good at this time. No concerns. |
| 04/22/2025 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Need map of TOS to complete. Will be supplied by James Olson. Phase 1 PIP CG24 and CG25 verified in place. Will need TOS map for CG20 through 24 for Phase 1 All PIP verified for both phases. |
| 08/01/2025 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | 08/01/25, we still have issues with missing trees at the park and either missing dg or hydro seed. |
| 08/01/2025 | ENGR Engineering Final | N/A | Not Ready | We still have unfinished lots that will require a final walk to be done. Letter concerning DG in -lace of hydro seed will be submitted as well as revisions for changes observed in drainage areas. 1 basin needs attention now that this area is completed where drainage from 2 cul de sacs run into. |
Completed Inspections
Permit Status: Issued
Permit Number: DP15-0102
Permit Description: Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/01/2025 | COT - ENGR - Signage Final | Passed | Grading and all signs have been installed |