Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
10495 S MILLICENT TR
Apply Date:
07/07/2015
Applicant:
David Young
Description:
Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "

Permit Reviews

Permit Number - DP15-0102
Permit Status: Issued
Permit Description: Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
Start Date Submittal Complete Date Status  
03/18/2022 REVISION - - 1ST 04/15/2022 COMPLETED Review Details
04/22/2022 REVISION - - 1ST 04/25/2022 ACTIVE Review Details
06/28/2021 DEV PKG - OK TO SUBMIT 07/08/2021 COMPLETED Review Details
07/07/2015 DEV PKG - OK TO SUBMIT 07/07/2015 COMPLETED Review Details
07/07/2015 SITE and/or GRADING 11/20/2015 COMPLETED Review Details
07/08/2021 REVISION - - 1ST 09/01/2021 COMPLETED Review Details
09/20/2021 REVISION - - 1ST 10/21/2021 COMPLETED Review Details
11/20/2015 RESUB - SITE/GRADING ALL 12/22/2015 COMPLETED Review Details
12/06/2021 REVISION - - 1ST 12/15/2021 COMPLETED Review Details
12/22/2015 RESUB - SITE and/or GRADING 06/24/2019 COMPLETED Review Details
09/16/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 09/24/2024 REQUIRES RESUBMIT Review Details
09/24/2024 DEVELOPMENT PACKAGE NEW REVISION v.2 10/23/2024 APPROVED Review Details
01/27/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 02/03/2025 REQUIRES RESUBMIT Review Details
02/20/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 03/28/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP15-0102
Permite Description: Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
05/26/2021 PDSD Engineering Division Pre-Construction SITE N/A Complete (Recurring) {Activity date: 05/26/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - THE VISTAS AT RINCON KNOLLS PHASE 2 LOTS 161-349 AND C.A. iAi-iEi. NEED TO RESCHEDULE FOR TOMORROW .} ; {Activity date: 04/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE .CONVERSATION WITH CLINT HE INFORMED ME THAT THEY CANNOT START .UNTIL THE TURTLE STUDY IS COMPLETED .WILL KEEP THE CITY INFORMED ON THE ON GOING STUDY .}
09/27/2021 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 09/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD TODAY.} ; {Activity date: 05/03/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - }
09/26/2023 SITE - Stormwater Final Inspection N/A Not Ready not ready yet until further more inspections is needed
10/05/2023 ENGR Grading Final N/A Not Ready Complete all work on this site is showing on the approved plans prior to calling in this inspection again for the final grading
10/31/2023 SITE - Stormwater Setup and Controls N/A Complete (Recurring) Residential construction. No one on site. Good at this time. No concerns.
04/22/2025 PDSD Site/Engineering Division - NPPO N/A Not Ready Need map of TOS to complete. Will be supplied by James Olson.

Phase 1 PIP CG24 and CG25 verified in place.

Will need TOS map for CG20 through 24 for Phase 1

All PIP verified for both phases.
08/01/2025 PDSD Site/Engineering Division - Landscaping N/A Not Ready 08/01/25, we still have issues with missing trees at the park and either missing dg or hydro seed.
08/01/2025 ENGR Engineering Final N/A Not Ready We still have unfinished lots that will require a final walk to be done.
Letter concerning DG in -lace of hydro seed will be submitted as well as revisions for changes observed in drainage areas.
1 basin needs attention now that this area is completed where drainage from 2 cul de sacs run into.

Completed Inspections

Permit Status: Issued
Permit Number: DP15-0102
Permit Description: Revision 3 - GRADING/SWPPP - The Vistas at Rincon Knolls, Phase 2, Lots 161 thru 349, Block 1, and Common Areas "
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/01/2025 COT - ENGR - Signage Final Passed Grading and all signs have been installed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LAST APPROVED GRADING SHTS_V1.PDF DOCUMENTS VIEW
R2_1 GRADING SHTS 9-24-24_V2.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW