Inspection History Details
Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - NPPO
Permit Number - DP15-0102
Inspection Description - PDSD Site/Engineering Division - NPPO
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | Not Ready | ||
| 04/22/2025 | PDSD Site/Engineering Division - NPPO | Not Ready | Need map of TOS to complete. Will be supplied by James Olson. Phase 1 PIP CG24 and CG25 verified in place. Will need TOS map for CG20 through 24 for Phase 1 All PIP verified for both phases. |
|
| 09/26/2023 | PDSD Site/Engineering Division - NPPO | Not Ready | not ready yet until further more inspections is needed |