Permit: DP12-0226
Permit Details
Apply Date:
12/03/2012
Applicant:
Description:
GRADING ONLY
Permit Reviews
Permit Number - DP12-0226
Permit Status: Complete
Permit Description: GRADING ONLY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2013 | RESUB - SITE and/or GRADING | 11/26/2013 | COMPLETED |
| 12/03/2012 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 12/03/2012 | COMPLETED |
| 12/04/2012 | GRADING | 04/01/2013 | COMPLETED |
Conditions
Permit Number - DP12-0226
Permit Status: Complete
Permit Description: GRADING ONLY
| Date | Description | Comments |
|---|---|---|
| 04/08/2013 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. | |
| 04/08/2013 | FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927. |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0226
Permit Description: GRADING ONLY
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/16/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP. 2) ENSURE SEDIEMNT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTIO 3) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAYS AS NECESSARY 4) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR PERMIT 5) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 6) SUPPLEMENTAL SEDIEMNT CONTROLS MAY BE NEEDED. CALL FOR RE-INSPECTION WHEN THE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED} ; {Activity date: 01/10/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH MIKE FROM LLOYD CONSTRUCTION AND ADVISED HIM THAT MIKE RUSSO WILL RETURN FOR THIS INSPECTION NEXT WEEK.} |
|
| 05/05/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 05/05/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 01/29/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME SEDIMENT CONTROLS HAVE BEEN INSTALLED, ADDITIONAL CONTROLS MAY BE NEEDED AS CONSTRUCTION PROGRESSES} | |
| 06/26/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 04/29/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES WITH PHASE I COMPLETION} ; {Activity date: 04/13/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 01/30/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL: 1) COMPLETE SITE GRADING AND LANDSCAPING PER APPROVED PLANS 2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD AND LANDSCAPE ARCHITECT STATING THAT SITE/GRADING/ AND LANDSCAPING WAS COMPLETED PER PLAN 3) PROVIDE AND AS-BUILT TO THE CITY OF TUCSON 4) FILE A "NOT" WITH ADEQ. 5) ENSURE ELEVATION CERTIFICATION HAS BEEN SUBMITTED. PRIOR TO APPROVAL FOR ENG, LANDSCAPING, SIGN, AND NPPO ON YOUR BLDG PERMIT: (TEMP C OF O) 1) SEPARATE THE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 2) PROVIDE SAFE PARKING, ACCESS, TRASH SERVICE, LANDSCAPING AND ALL OTHER SERVICES NEEDED TO OCCUPY THE NEW BLDG.} |
|
| 06/26/2015 | ENGR Engineering Final | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 04/29/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES WITH PHASE I COMPLETION} ; {Activity date: 04/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL COMPLETE ALL CONSTRUCTION PER THE APPROVED PLANS} ; {Activity date: 01/30/2015; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL: 1) COMPLETE SITE GRADING AND LANDSCAPING PER APPROVED PLANS 2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD AND LANDSCAPE ARCHITECT STATING THAT SITE/GRADING/ AND LANDSCAPING WAS COMPLETED PER PLAN 3) PROVIDE AND AS-BUILT TO THE CITY OF TUCSON 4) FILE A "NOT" WITH ADEQ. 5) ENSURE ELEVATION CERTIFICATION HAS BEEN SUBMITTED. PRIOR TO APPROVAL FOR ENG, LANDSCAPING, SIGN, AND NPPO ON YOUR BLDG PERMIT: (TEMP C OF O) 1) SEPARATE THE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 2) PROVIDE SAFE PARKING, ACCESS, TRASH SERVICE, LANDSCAPING AND ALL OTHER SERVICES NEEDED TO OCCUPY THE NEW BLDG.} ; {Activity date: 01/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 2) PROVIDE AN AS-BUILT DRAWING TO THE CITY OF TUCSON 3) ENSURE ALL SITE/GRADING WAS COMPLETED PER APPROVED PLAN} ; {Activity date: 04/04/2013; Status: Prior to Final Inspectn; Inspector: eleibol1; Comment: Entered by ELEIBOL1 - Elevation Certificates will be required for each structure for post construction.} |
|
| 06/26/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 04/21/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/07/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CHANGES OR COCNERNS AT THIS TIME} ; {Activity date: 02/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME 2) SOME CHANGES MADE TO SITE/GRADING NEED APPROVED PLAN TO SHOW CHANGES} ; {Activity date: 11/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) WALKED SITE, NO SIGNIFICANT SITE WORK COMPLETED. 2) NO STORM WATER CONCERS AT THIS TIME} ; {Activity date: 09/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/26/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 08/08/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS} ; {Activity date: 07/21/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) ENSURE ALL SEDIMENT CONTROLS ARE IN PLACE PER YOUR SWPPP 3) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 07/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONERNS AT THIS TIME} ; {Activity date: 06/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 05/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN RE-INSTALLED ALONG THE WEST SIDE OF THE SITE. 2) NO SIGNIFICANT SITE WORK AT THIS TIME 3) ENSURE TRACKING OF SOIL ONTO ADJACENT PUBLIC ROADWAYS IS SWEPT UP ON A ROUTINE BASIS} ; {Activity date: 02/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES, WILL FOLLOW UP NEXT WEEK} ; {Activity date: 02/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS "SILT SOCK" MUST BE RE-INSTALLED PROPERLY ALONG THE WEST/SOUTH. 2) CONTROLS ALONG THE WEST PERIMETER MUST OVERLAP AND THE ENDS MUST BE STAKED INTO THE GROUND - FILL IN GAPS WHERE CONTROLS HAVE NOT BEEN INSTALLED. 3) CONTROLS ALONG THE SOUTH MUST OVERLAP AND THE ENDS MUST BE STAKED INTO THE GROUND. 4) NO SIGNIFICANT SITE WORK AT THIS TIME CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS HAVE BEEN CORRECTED} ; {Activity date: 02/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SOME SEDIMENT CONTROLS (SILT SOCK) IN PLACE ALONG THE WEST AND SOUTH CORNERS OF THE SITE. 2) THE CONTRACTOR STATED THE ADDITIONAL CONTROLS WOULD BE INSTALLED ALONG THE SOUTH PERIMETER 3) ENSURE SW SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) BLDG PAD HAS BEEN CONSTRUTED AND ROUGH GRADING HAS BEEN COMPLETED, MINIMAL SITE WORK FOR THIS PROJECT 5) SWEEP UP TRACKING FROM OFF SITE AS NEEDED} ; {Activity date: 01/16/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP. 2) ENSURE SEDIEMNT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTIO 3) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAYS AS NECESSARY 4) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR PERMIT 5) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 6) SUPPLEMENTAL SEDIEMNT CONTROLS MAY BE NEEDED. CALL FOR RE-INSPECTION WHEN THE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED} ; {Activity date: 01/10/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NO CONCERNS AT THIS TIME. STORMWATER CONTROLS HAVE BEEN PLACED ALONG THE SOUTHSIDE OF THIS PROJECT.} |
|
| 06/26/2015 | ENGR Grading Final | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by BGRANT1 - } ; {Activity date: 10/16/2014; Status: Continued; Inspector: ELEIBOL1; Comment: Entered by ARUIZ1 - "Fire cannot approve the changes, turning radius cannot be met with proposed layout in the parking area. No way can Fire can go into entrance, turn left & then right again to get to main entrance. Engineering requests payment of remaining FPUP fees. TDOT can accept the location of the entrance with conditon that all new sidewalk jogs comply with COT/PC Stnd Dtls for horizontal geometry. Since Fire requirements are not met the City can not accept this proposed revision. EOR was emailed - that they would need to make sure Development Plan is also updated and reviewed first by Fire before submitting for the revised Development Plan. The re-revised grading plan may still be processed as a Tier 1."} | |
| 06/26/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 06/26/2015; Status: Approved; Inspector: MRUSSO1; Comment: Entered by DROBERT5 - } ; {Activity date: 01/30/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL: 1) COMPLETE SITE GRADING AND LANDSCAPING PER APPROVED PLANS 2) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD AND LANDSCAPE ARCHITECT STATING THAT SITE/GRADING/ AND LANDSCAPING WAS COMPLETED PER PLAN 3) PROVIDE AND AS-BUILT TO THE CITY OF TUCSON 4) FILE A "NOT" WITH ADEQ. 5) ENSURE ELEVATION CERTIFICATION HAS BEEN SUBMITTED. PRIOR TO APPROVAL FOR ENG, LANDSCAPING, SIGN, AND NPPO ON YOUR BLDG PERMIT: (TEMP C OF O) 1) SEPARATE THE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 2) PROVIDE SAFE PARKING, ACCESS, TRASH SERVICE, LANDSCAPING AND ALL OTHER SERVICES NEEDED TO OCCUPY THE NEW BLDG.} |