Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP.
2) ENSURE SEDIEMNT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTIO
3) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAYS AS NECESSARY
4) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR PERMIT
5) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE
6) SUPPLEMENTAL SEDIEMNT CONTROLS MAY BE NEEDED.
CALL FOR RE-INSPECTION WHEN THE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED |