| 06/26/2015 |
SITE - Stormwater Follow-up
|
MRUSSO1 |
Approved |
Entered by DROBERT5 - |
| 04/21/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 01/07/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT CHANGES OR COCNERNS AT THIS TIME |
| 02/04/2015 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME
2) SOME CHANGES MADE TO SITE/GRADING NEED APPROVED PLAN TO SHOW CHANGES |
| 11/14/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME |
| 11/05/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) WALKED SITE, NO SIGNIFICANT SITE WORK COMPLETED.
2) NO STORM WATER CONCERS AT THIS TIME |
| 09/05/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 08/26/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO STORM WATER COCNERNS AT THIS TIME |
| 08/08/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS |
| 07/21/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) ENSURE ALL SEDIMENT CONTROLS ARE IN PLACE PER YOUR SWPPP
3) ENSURE STORM WATER MAINT INSPECTIONS ARE PERFORMED AND DOCUMENTED |
| 07/02/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONERNS AT THIS TIME |
| 06/03/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
| 05/05/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 03/13/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN RE-INSTALLED ALONG THE WEST SIDE OF THE SITE.
2) NO SIGNIFICANT SITE WORK AT THIS TIME
3) ENSURE TRACKING OF SOIL ONTO ADJACENT PUBLIC ROADWAYS IS SWEPT UP ON A ROUTINE BASIS |
| 02/28/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES, WILL FOLLOW UP NEXT WEEK |
| 02/25/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SEDIMENT CONTROLS "SILT SOCK" MUST BE RE-INSTALLED PROPERLY ALONG THE WEST/SOUTH.
2) CONTROLS ALONG THE WEST PERIMETER MUST OVERLAP AND THE ENDS MUST BE STAKED INTO THE GROUND - FILL IN GAPS WHERE CONTROLS HAVE NOT BEEN INSTALLED.
3) CONTROLS ALONG THE SOUTH MUST OVERLAP AND THE ENDS MUST BE STAKED INTO THE GROUND.
4) NO SIGNIFICANT SITE WORK AT THIS TIME
CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS HAVE BEEN CORRECTED |
| 02/07/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
| 01/29/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) SOME SEDIMENT CONTROLS (SILT SOCK) IN PLACE ALONG THE WEST AND SOUTH CORNERS OF THE SITE.
2) THE CONTRACTOR STATED THE ADDITIONAL CONTROLS WOULD BE INSTALLED ALONG THE SOUTH PERIMETER
3) ENSURE SW SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
4) BLDG PAD HAS BEEN CONSTRUTED AND ROUGH GRADING HAS BEEN COMPLETED, MINIMAL SITE WORK FOR THIS PROJECT
5) SWEEP UP TRACKING FROM OFF SITE AS NEEDED |
| 01/16/2014 |
SITE - Stormwater Follow-up
|
MRUSSO |
Continued |
Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP.
2) ENSURE SEDIEMNT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTIO
3) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAYS AS NECESSARY
4) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR PERMIT
5) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE
6) SUPPLEMENTAL SEDIEMNT CONTROLS MAY BE NEEDED.
CALL FOR RE-INSPECTION WHEN THE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED |
| 01/10/2014 |
SITE - Stormwater Follow-up
|
DROBERTS |
Continued |
Entered by DROBERT5 - NO CONCERNS AT THIS TIME. STORMWATER CONTROLS HAVE BEEN PLACED ALONG THE SOUTHSIDE OF THIS PROJECT. |