Permit: DP12-0226

Parcel: Unknown


Addresses:

1002 N MAIN AV

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
06/26/2015 ENGR Grading Final MRUSSO Approved Entered by BGRANT1 -
10/16/2014 ENGR Grading Final ELEIBOL1 Continued Entered by ARUIZ1 - "Fire cannot approve the changes, turning radius cannot be met with proposed layout in the parking area. No way can Fire can go into entrance, turn left & then right again to get to main entrance. Engineering requests payment of remaining FPUP fees. TDOT can accept the location of the entrance with conditon that all new sidewalk jogs comply with COT/PC Stnd Dtls for horizontal geometry. Since Fire requirements are not met the City can not accept this proposed revision. EOR was emailed - that they would need to make sure Development Plan is also updated and reviewed first by Fire before submitting for the revised Development Plan. The re-revised grading plan may still be processed as a Tier 1."
06/26/2015 ENGR Grading Final MRUSSO1 Approved Entered by DROBERT5 -
06/26/2015 ENGR Grading Final MRUSSO1 Approved Entered by DROBERT5 -
05/11/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME
03/27/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) NEED TO VERIFY AND MEASURE PVC USED FOR STORM WATER CONVEYANCE 2) ENSURE SITE/GRADING CHANGES ARE REVISED AND SHOWN ON AN APPROVED PLANS 3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
02/11/2015 ENGR Grading Final eleibol1 Continued Entered by DROBERT5 - EL CERT RECEIVED 11 FEB 2015
02/04/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME 2) SOME CHANGES MADE TO SITE/GRADING NEED APPROVED PLAN TO SHOW CHANGES
11/14/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SITE WORK AT THIS TIME
11/05/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) WALKED SITE, NO SIGNIFICANT SITE WORK COMPLETED. 2) NO STORM WATER CONCERS AT THIS TIME
08/26/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SITE/GRADING CHANGES AND OR CONCERNS AT THIS TIME
08/08/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE/GRADING AT THIS TIME
07/21/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SITE/GRADING AT THIS TIME
07/02/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE WORK AT THIS TIME
06/03/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - MINIMAL SITE WORK AT THIS TIME. CONTRCTOR WORKING ON THE BLDG
05/05/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SITE WORK AT THIS TIME, CONTRACTOR WORKING ON BLDG
03/13/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN RE-INSTALLED ALONG THE WEST SIDE OF THE SITE. 2) NO SIGNIFICANT SITE WORK AT THIS TIME 3) ENSURE TRACKING OF SOIL ONTO ADJACENT PUBLIC ROADWAYS IS SWEPT UP ON A ROUTINE BASIS
02/28/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO SIGNIFICANT SITE WORK, CONTRACTOR WORKING ON BLDG PAD
02/25/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) SEDIMENT CONTROLS "SILT SOCK" MUST BE RE-INSTALLED PROPERLY ALONG THE WEST/SOUTH. 2) CONTROLS ALONG THE WEST PERIMETER MUST OVERLAP AND THE ENDS MUST BE STAKED INTO THE GROUND - FILL IN GAPS WHERE CONTROLS HAVE NOT BEEN INSTALLED. 3) CONTROLS ALONG THE SOUTH MUST OVERLAP AND THE ENDS MUST BE STAKED INTO THE GROUND. 4) NO SIGNIFICANT SITE WORK AT THIS TIME CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS HAVE BEEN CORRECTED
01/29/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) SOME SEDIMENT CONTROLS (SILT SOCK) IN PLACE ALONG THE WEST AND SOUTH CORNERS OF THE SITE. 2) THE CONTRACTOR STATED THE ADDITIONAL CONTROLS WOULD BE INSTALLED ALONG THE SOUTH PERIMETER 3) ENSURE SW SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 4) BLDG PAD HAS BEEN CONSTRUTED AND ROUGH GRADING HAS BEEN COMPLETED, MINIMAL SITE WORK FOR THIS PROJECT 5) SWEEP UP TRACKING FROM OFF SITE AS NEEDED
01/16/2014 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EXIT PER YOUR SWPPP. 2) ENSURE SEDIEMNT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTIO 3) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAYS AS NECESSARY 4) PERFORM AND DOCUMENT ALL STORM WATER SELF INSPECTIONS PER YOUR PERMIT 5) INSTALL AND USE A CONCRETE/MATERIALS WASH OUT WHEN APPLICABLE 6) SUPPLEMENTAL SEDIEMNT CONTROLS MAY BE NEEDED. CALL FOR RE-INSPECTION WHEN THE CONSTRUCTION ENTRANCE HAS BEEN INSTALLED
01/10/2014 ENGR Grading Final DROBERTS Continued Entered by DROBERT5 - CONTRACTOR IS WORKING ON THE PLACEMENT OF FILL MATERIAL ON THE NORTH AND EAST SIDE OF THIS SITE AT THIS TIME.
04/04/2013 ENGR Grading Final eleibol1 Prior to Intermediates Entered by ELEIBOL1 - Elevation Certificates will be required for each structure for both at pre-slab and for post construction.