Permit Details

Status:
Complete
Type:
Development Package
Address:
4930 N 1ST AV
Address NEW:
4930 N 1ST AV
Apply Date:
06/20/2012
Applicant:
Description:
SKYLINE PEDIATRICSOriginal approval date 10/16/121st Revision approved 9/13/13 (did not go thr

Permit Reviews

Permit Number - DP12-0094
Permit Status: Complete
Permit Description: SKYLINE PEDIATRICSOriginal approval date 10/16/121st Revision approved 9/13/13 (did not go thr
Start Date Submittal Complete Date Status  
01/07/2014 REVISION - GRADING 02/07/2014 COMPLETED Review Details
03/21/2014 REVISION - - 2ND 04/18/2014 COMPLETED Review Details
06/20/2012 DEV PKG - OK TO SUBMIT 06/29/2012 COMPLETED Review Details
06/29/2012 DEV PKG 08/16/2012 COMPLETED Review Details
08/16/2012 DEV PKG - RESUBMITTAL 09/27/2012 COMPLETED Review Details
09/13/2013 REVISION - - 1ST 09/13/2013 COMPLETED Review Details
09/26/2014 REVISION - - 3RD 10/23/2014 COMPLETED Review Details
09/27/2012 DEV PKG - RESUBMITTAL 10/29/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0094
Permit Description: SKYLINE PEDIATRICSOriginal approval date 10/16/121st Revision approved 9/13/13 (did not go thr
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/25/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/25/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH SITE SUPERINTENDENT/ARCHITECT (JAMES MCMAHON 321-0468/982-8182) ON SITE AND DISCUSSED STORM WATER REQ AND THE APPROVED SITE/GRADING PLAN} ; {Activity date: 11/05/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ON SITE TOO DISCUSS WHAT IS ANTICIPATED TO HAPPEN OVER THE NEXT FEW WEEKS. I WILL STOP BY TOMORROW AND LOOK AT WHAT IS HAPPENING ON THIS SITE AT THIS TIME.}
10/28/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 10/28/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 12/14/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME UTILITY WORK BEING DONE.
PERIMETER SEDIMENT CONTROLS IN PLACE

NO SIGNIFICANT CONCERNS AND/OR PROBLEMS AT THIS TIME.}
12/03/2013 SITE - Stormwater Follow-up Passed {Activity date: 12/03/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE HAS BEEN STABILIZED.
2) FILE YOUR NOTICE OF TERMINATION WITH ADEQ} ; {Activity date: 11/12/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE CHANGES MADE TO EROSION PROTECTION FOR THE PERIMETER SLOPE ALONG THE SOUTH SIDE OF THE SITE ARE SHOWN IN AN AS-BUILT DRAWING.
2) INSTALL RAILING ALONG PEDESTRIAN ACCESS RAMP AT WEST SIDEWALK AND STAIRS.
3) TRASH ENCLOSURE CONSTRUCTION DOES NOT MEET THE DEV. STD 6-0.10 HOWEVER IT WAS APPROVED BY THE ENGINEERING REVIEWER LAUREN MAKUS.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/28/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS} ; {Activity date: 10/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR CATCH BASIN AND ADJACENT 12" CMP. OK TO POUR BOTTOM OF BASIN. WILL RE-INSPECT
2) MEASURED SLOPE OF PEDESTRIAN ACCESS OFF OF 1ST AVE. SLOPE IS >5%. CONTRACTOR MUST REDUCE SLOPE FOR ACCESS WAY OR COMPLY WITH ADA REQUIREMENTS FOR A RAMP.
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/15/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AN/OR CONCERNS AT THIS TIME} ; {Activity date: 07/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR IS STILL WORKING ON THE BLDG, NO SIGNIFICANT SITE WORK AT THIS TIME.
2) NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/26/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 06/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME} ; {Activity date: 05/22/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE NEEDS A RETAINING WALL ALONG THE SOUTH PERIMETER. GRADE DIFFERENTIAL IS GREATER THAN 4 FEET
2) SOME SITE WORK COMPLETED
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 05/13/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES} ; {Activity date: 05/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME
NO ACTIVITY ON SITE} ; {Activity date: 04/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY ON SITE. MAY NEED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS ALONG THE SOUTH SIDE
} ; {Activity date: 04/16/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MINIMAL SITE WORK, NO SIGNIFICANT CHANGES
NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/27/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ADD BOLLARDS TO EACH SIDE OF TRASH ENCLOSURE
2) ENSURE 10' INSIDE CLEAR WIDTH OF ENCLOSURE FOR CONTAINER PER THE DEV. STD.
3) REBAR LAY-OUT OK FOR TRASH ENCLOSURE WALLS.
4) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
5) CONTRACTOR WORKING ON WALLS OF BLDG} ; {Activity date: 02/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT CONCERNS AT THIS TIME} ; {Activity date: 02/06/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 01/29/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - OFF AND ON RAIN SHOWERS, NO ACTIVITY ON SITE.
CONTRACTOR WORKING ON FOOTING FOR A RETAINING WALL.
SOME PERIMETER SEDIMENT CONTROLS IN PLACE
NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/11/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 12/20/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY ON SITE, NO CHANGES.
NEED TO ADD SEDIMENT CONTROLS TO SE CORNER OF SITE} ; {Activity date: 12/14/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME UTILITY WORK BEING DONE.
PERIMETER SEDIMENT CONTROLS IN PLACE

NO SIGNIFICANT CONCERNS AND/OR PROBLEMS AT THIS TIME.} ; {Activity date: 12/07/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO ACTIVITY ON THE SITE, HOWEVER THE SITE HAS BEEN ROUGH GRADED AND UTILITY WORK IS BEING DONE.

THE SITE DOES NOT HAVE A SWPPPP HOWEVER SOME SEDIEMNT CONTROLS HAVE BEEN INSTALLED}
12/03/2013 SITE - Stormwater Final Inspection Passed {Activity date: 12/03/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE HAS BEEN STABILIZED.
2) FILE YOUR NOTICE OF TERMINATION WITH ADEQ}
12/03/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 12/03/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/06/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE DEVELOPERS PERSONNEL ARE REMOVING ALL OF THE CURRENT VEGETATION ON THIS TIME, THERE IS NOT A NPPO PLAN FOR THIS SITE ALL EXISTING PLANT MATERIAL WILL BE REMOVED AND LATER REPLACED WITH THE VEGETAION TYPE AND SIZES AS SHOWN ON THE APPROVED PLANS.} ; {Activity date: 11/06/2012; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THIS INSPECTION WAS CALLED IN BUT IS NOT REQUIRED AT THIS TIME.}
10/23/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/23/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) BUILDING IS OCCUPIED, NO INSPECTION CALLED IN FOR FINAL.
2) LANDSCAPING HAS NOT BEEN COMPLETED, CONTRACTOR WORKING ON INSTALLING ROCK RIP RAP WHILE I WAS ON SITE
3) CONTRACTOR NEEDS TO INSTALL STABILIZATION ( ROCK OR HYDROSEED) TO AREAS THAT HAVE BEEN DISTURBED DURING CONSTRUCTION.
4) CONTRACTOR MUST REMOVE SOIL THAT WAS USED AS A RAMP ALONG THE SOUTHEAST CORNER OF THE SITE.
5) CONTRACTOR MUST COMPLETE THE INSTALLATION OF THE HANDRAILING FOR PEDESTRIAN ACCESS OFF OF 1ST AVE.} ; {Activity date: 12/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING REQUEST FOR LANDSCAPE INSPECTION}
10/23/2014 ENGR Engineering Final Passed {Activity date: 10/23/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - AWAITING FINAL GRADING INSPECTION REQUEST} ; {Activity date: 01/10/2014; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - THE FOLLOWING ISSUES WILL BE TURNED OVER TO THE DEVELOPMENT PACKAGE PERMIT FOR RESOLUTION: 1) MISSING SIDEWALK FROM THE BUILDING TO THE TRASH ENCLOSURE. 2) WATER FROM THE BASIN IS DIRECTED ONTO THE ADJACENT SIDEWALKS ON THE EAST SIDE OF 1ST AVENUE. 3) ROCK RIP RAP ON THIS SITE DOES NOT HAVE FILTER FABRIC UNDERNEATH IT TO PREVENT SOIL MOVEMENT AND EROSION. 4) EXISTING DREIVEWAYS HAVE NOT BEEN CLOSED AND NEW SIDEWALK TO REPLACE THE EXISTING DRIVEWAY APRONS.} ; {Activity date: 12/04/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 -
BUILDING HAS BEEN OCCUPIED, NO INSPECTION CALLED IN.

1) AWAITING FINAL GRADING INPECTION REQUEST
2) NEED AS-BUILT DRAWING SHOWING CHANGES MADE TO THE SITE/GRADING PLAN
3) AWAITING FOR A CERT STATEMENT FROM THE ENG OF RECORD.
4) COMPLETE ALL SITE/GRADING/LANDSCAPING PER APPROVED PLAN} ; {Activity date: 12/03/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) AWAITING FINAL GRADING INPECTION REQUEST
2) NEED AS-BUILT DRAWING SHOWING CHANGES MADE TO THE SITE/GRADING PLAN
3) AWAITING FOR A CERT STATEMENT FROM THE ENG OF RECORD.
4) COMPLETE ALL SITE/GRADING/LANDSCAPING PER APPROVED PLAN}
10/23/2014 ENGR Grading Final Passed {Activity date: 10/23/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
001_SITE_C1 OF 7.TIF DEVPLANS VIEW
002_GRADING_C2 OF 7.TIF DEVPLANS VIEW
003_GRADING NOTES & DETAILS_C3 OF 7 DEVPLANS VIEW
004_R.O.W. IMPROVEMENT_C4 OF 7.TIF DEVPLANS VIEW
004_LANDSCAPE_L1 OF 7.TIF DEVPLANS VIEW
005_WATER HARVESTING IMPLENENTAION_L2 OF 7.TIF DEVPLANS VIEW
003_R-P 1.TIF DEVPLANS VIEW
TRASH ENCLOSURE E-MAIL.TIF DOCUMENTS VIEW
None DOCUMENTS VIEW